In this study, we consider single-machine scheduling problems with past-sequence-dependent (denoted by psd) setup times in which the setup times of jobs are proportional to the length of already processed jobs. Under common (CON) and slack (SLK) due-date assignment methods, we prove that the weighted sum of earliness, tardiness and due-date minimization remains polynomially solvable. We also give some extensions for the scheduling problems with psd setup times.
Keywords: Scheduling, single-machine, past-sequence-dependent setup times, position-dependent weights
@article{RO_2021__55_S1_S2747_0,
author = {Wang, Li-Yan and Huang, Xue and Liu, Wei-Wei and Wu, Yu-Bin and Wang, Ji-Bo},
title = {Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times},
journal = {RAIRO. Operations Research},
pages = {S2747--S2758},
year = {2021},
publisher = {EDP-Sciences},
volume = {55},
doi = {10.1051/ro/2020117},
mrnumber = {4223180},
language = {en},
url = {https://www.numdam.org/articles/10.1051/ro/2020117/}
}
TY - JOUR AU - Wang, Li-Yan AU - Huang, Xue AU - Liu, Wei-Wei AU - Wu, Yu-Bin AU - Wang, Ji-Bo TI - Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times JO - RAIRO. Operations Research PY - 2021 SP - S2747 EP - S2758 VL - 55 PB - EDP-Sciences UR - https://www.numdam.org/articles/10.1051/ro/2020117/ DO - 10.1051/ro/2020117 LA - en ID - RO_2021__55_S1_S2747_0 ER -
%0 Journal Article %A Wang, Li-Yan %A Huang, Xue %A Liu, Wei-Wei %A Wu, Yu-Bin %A Wang, Ji-Bo %T Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times %J RAIRO. Operations Research %D 2021 %P S2747-S2758 %V 55 %I EDP-Sciences %U https://www.numdam.org/articles/10.1051/ro/2020117/ %R 10.1051/ro/2020117 %G en %F RO_2021__55_S1_S2747_0
Wang, Li-Yan; Huang, Xue; Liu, Wei-Wei; Wu, Yu-Bin; Wang, Ji-Bo. Scheduling with position-dependent weights, due-date assignment and past-sequence-dependent setup times. RAIRO. Operations Research, Tome 55 (2021), pp. S2747-S2758. doi: 10.1051/ro/2020117
[1] , The third comprehensive survey on scheduling problems with setup times/costs. Eur. J. Oper. Res. 246 (2015) 345–378. | MR | DOI
[2] , , and , A survey of scheduling problems with setup times or costs. Eur. J. Oper. Res. 187 (2008) 985–1032. | MR | Zbl | DOI
[3] , A state-of-the-art review on scheduling with learning effects. Eur. J. Oper. Res. 188 (2008) 315–329. | MR | Zbl | DOI
[4] and , Single-machine scheduling against due dates with past-sequence-dependent setup times. Eur. J. Oper. Res. 191 (2008) 587–592. | MR | Zbl | DOI
[5] , Scheduling Algorithms, 3rd edition. Springer, Berlin-Heidelberg (2001). | MR | Zbl
[6] , and , Scheduling problems with deteriorating jobs and learning effects including proportional setup times. Comput. Ind. Eng. 58 (2010) 326–331. | DOI
[7] , and , Single-machine scheduling with deteriorating jobs and past-sequence-dependent setup times. Appl. Math. Model. 35 (2011) 1861–1867. | MR | Zbl | DOI
[8] , Minimizing the earliness and tardiness cost of a sequence of tasks on a single machine. RAIRO:OR 35 (2001) 165–187. | MR | Zbl | Numdam | DOI
[9] , Time-Dependent Scheduling. Springer, Berlin-Heidelberg (2008). | MR | Zbl
[10] , and , A survey of the state of-the-art of common due date assignment and scheduling research. Eur. J. Oper. Res. 139 (2002) 1–25. | MR | Zbl | DOI
[11] , and , Due date assignment and scheduling: SLK, TWK and other due date assignment models. Prod. Plan. Control 13 (2002) 117–132. | DOI
[12] , , and , Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Disc. Math. 5 (1979) 287–326. | MR | Zbl | DOI
[13] , and , Inequalities, 2nd edition. Cambridge University Press, Cambridge, UK (1967). | MR | Zbl
[14] , and , Unrelated parallel machine scheduling with past-sequence-dependent setup time and learning effects. Appl. Math. Model. 35 (2011) 1492–1496. | MR | Zbl | DOI
[15] , , and , Single machine scheduling with general time-dependent deterioration, position-dependent learning and past sequence-dependent setup times. Optim. Lett. 7 (2013) 1793–1804. | MR | Zbl | DOI
[16] and , Single-machine scheduling problems with past-sequence-dependent setup times. Eur. J. Oper. Res. 187 (2008) 1045–1049. | MR | Zbl | DOI
[17] and , New results for single-machine scheduling with past-sequence-dependent setup times and due date-related objectives. Eur. J. Oper. Res. 278 (2019) 149–159. | MR | DOI
[18] and , Single-machine scheduling with past-sequence-dependent setup times and learning effects. Inf. Process. Lett. 102 (2007) 22–26. | MR | Zbl | DOI
[19] , and , Some unrelated parallel machine scheduling problems with past-sequence-dependent setup time and learning effects. Comput. Ind. Eng. 61 (2011) 179–183. | DOI
[20] , and , Common due window size and location determination in a single machine scheduling problem. J. Oper. Res. Soc. 49 (1998) 1007–1010. | Zbl | DOI
[21] , and , Bicriteria scheduling for due date assignment with total weighted tardiness. RAIRO:OR 52 (2018) 359–370. | MR | DOI
[22] , and , Single machine scheduling with slack due dates assignment. Eng. Optim. 49 (2017) 709–717. | MR | DOI
[23] , , and , Optimal due-date assignment problem with learning effect and resource-dependent processing times. Optim. Lett. 8 (2014) 113–127. | MR | Zbl | DOI
[24] , and , Scheduling jobs with truncated exponential sum-of-logarithm-processing-times based and position-based learning effects. Asia Pac. J. Oper. Res. 32 (2015) 1550026. | MR | DOI
[25] , and , Single-machine scheduling with past-sequence-dependent setup times and learning effects: a parametric analysis. Int. J. Syst. Sci. 42 (2011) 2097–2102. | MR | Zbl | DOI
[26] , Scheduling in bicriteria single machine systems with past-sequence-dependent setup times and learning effects. J. Oper. Res. Soc. 65 (2014) 1017–1036. | DOI
[27] , Optimizing batch-processing operations with batch-position-based learning effects. To appear in: RAIRO:OR. DOI: (2021). | DOI | MR | Numdam
[28] , Single-machine scheduling with past-sequence-dependent setup times and time-dependent learning effect. Comput. Ind. Eng. 55 (2008) 584–591. | DOI
[29] and , Single machine past-sequence-dependent setup times scheduling with general position-dependent and time-dependent learning effects. Appl. Math. Model. 35 (2011) 1388–1395. | MR | Zbl | DOI
[30] and , Single-machine bicriterion group scheduling with deteriorating setup times and job processing times. Appl. Math. Comput. 242 (2014) 309–314. | MR
[31] and , Scheduling with past-sequence-dependent setup times and learning effects on a single machine. Int. J. Adv. Manuf. Technol. 48 (2010) 739–746. | DOI
[32] and , Scheduling problems with past-sequence-dependent setup times and general effects of deterioration and learning. Appl. Math. Model. 37 (2013) 4905–4914. | MR | DOI
[33] , , , , and , Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times. Comput. Math. App. 57 (2009) 9–16. | MR | Zbl
[34] , , and , Single machine scheduling with truncated job-dependent learning effect. Optim. Lett. 8 (2014) 669–677. | MR | Zbl | DOI
[35] , , , and , Single machine CON/SLK due date assignment scheduling with controllable processing time and job-dependent learning effects. Comput. J. 61 (2018) 1329–1337. | MR | DOI
[36] , and , Research on -machine flow shop scheduling with truncated learning effects. Int. Trans. Oper. Res. 26 (2019) 1135–1151. | MR | DOI
[37] , , , and , Scheduling with a position-weighted learning effect and job release dates. Eng. Optim. 52 (2020) 1475–1493. | MR | DOI
[38] , , , and , Single-machine scheduling and common due date assignment with potential machine disruption. Int. J. Prod. Res. 56 (2018) 1345–1360. | DOI
[39] and , Single-machine scheduling CON/SLK due window assignment problems with sum-of-processed time based learning effect. Appl. Math. Comput. 250 (2015) 628–635. | MR
[40] , , and , Single-machine common/slack due window assignment problems with linear decreasing processing times. Eng. Optim. 49 (2017) 1388–1400. | MR | DOI
Cité par Sources :