@article{RO_1999__33_4_439_0,
author = {Haouari, Mohamed and Daouas, Thouraya},
title = {Optimal scheduling of the $3$-machine assembly-type flow shop},
journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
pages = {439--445},
year = {1999},
publisher = {EDP Sciences},
volume = {33},
number = {4},
mrnumber = {1735447},
zbl = {0961.90033},
language = {en},
url = {https://www.numdam.org/item/RO_1999__33_4_439_0/}
}
TY - JOUR AU - Haouari, Mohamed AU - Daouas, Thouraya TI - Optimal scheduling of the $3$-machine assembly-type flow shop JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 1999 SP - 439 EP - 445 VL - 33 IS - 4 PB - EDP Sciences UR - https://www.numdam.org/item/RO_1999__33_4_439_0/ LA - en ID - RO_1999__33_4_439_0 ER -
%0 Journal Article %A Haouari, Mohamed %A Daouas, Thouraya %T Optimal scheduling of the $3$-machine assembly-type flow shop %J RAIRO - Operations Research - Recherche Opérationnelle %D 1999 %P 439-445 %V 33 %N 4 %I EDP Sciences %U https://www.numdam.org/item/RO_1999__33_4_439_0/ %G en %F RO_1999__33_4_439_0
Haouari, Mohamed; Daouas, Thouraya. Optimal scheduling of the $3$-machine assembly-type flow shop. RAIRO - Operations Research - Recherche Opérationnelle, Tome 33 (1999) no. 4, pp. 439-445. https://www.numdam.org/item/RO_1999__33_4_439_0/
and , Two Branch and Bound algorithms for the Permutation Flow Shop Problem, European J. Oper. Res., 1996, 90, n° 2, p. 238-251. | Zbl
and , A Heuristic for the Two-Stage Hybrid flow Shop Problem, Oper. Res. Lett., 1997, 21, n° 1, p. 43-53. | Zbl | MR
, Optimal Two and Three-Stage Production Schedule with Setup Times Included, Naval Res. Logist. Quart., 1954, 1, p. 61-68.
, Les problèmes d'ordonnancement, RAIRO-Oper. Res., 1993, 27, p. 77-150. | Numdam | MR | EuDML | Zbl
, , and , Sequencing and Scheduling: Algorithms and Complexity, in: Operations Research and Management Science, Vol.4: Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, p. 445-522.
, and , Minimizing the makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem, Management Sci., 1993, 39, p. 616-625. | Zbl
and , Two-stage Flowshop Scheduling with a Common Second-Stage Machine, INFORMS Meeting, Los Angeles, May 1995. | Zbl
, , , and , The Two-Stage Assembly Scheduling Problem: Complexity and Approximation, Oper. Res., 1995, 43, p. 346-355. | Zbl | MR






