@article{RO_1993__27_1_77_0,
author = {Gotha},
title = {Les probl\`emes d'ordonnancement},
journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
pages = {77--150},
year = {1993},
publisher = {EDP Sciences},
volume = {27},
number = {1},
mrnumber = {1209112},
language = {fr},
url = {https://www.numdam.org/item/RO_1993__27_1_77_0/}
}
Gotha. Les problèmes d'ordonnancement. RAIRO - Operations Research - Recherche Opérationnelle, Tome 27 (1993) no. 1, pp. 77-150. https://www.numdam.org/item/RO_1993__27_1_77_0/
[ACHU 82] et , Complexity and Solution of Some Three-Stage Flow-Shop Scheduling Problem, Math. Opns. Res., 1982, 7, p. 532-544. | Zbl | MR
[ADAM 88] , et , The Shifting Bottleneck Procedure for Job Shop Scheduling, Management Sci., 1988, 34, p. 391-401. | Zbl | MR
[AIKE 88] et , Optimal Loop Parallelization, Proc. of the SIG-PLAN'88 Conf. on Prog. Language Design an Implementation, Atlanta, U.S.A., june 1988, p. 308-317.
[ANGE 87] , et , Self Organizing Features Maps on the Travelling Salesman Problem, Rapport Interne Thomson C.S.F./D.S.E., 1987.
[AXSA 84] et , Aggregation and Dissaggregation in Hierarchical Production Planning, EJOR, 1984, 17, p. 338-350. | MR
[BAKE 74] , Introduction to Sequencing and Scheduling, John Wiley, 1974.
[BAKE 90] , Scheduling Groups of Jobs in the Two-Machine Flow Shop, Math. Comput. Modelling, 1990, 13, 3, p. 29-36. | MR
[BELL 82] , et , Mathematical Aspects of Scheduling and Applications, Pergamon Press, Oxford, England, 1982. | Zbl | MR
[BIEG 90] et , Genetic Algorithms and Job Shop Scheduling, Comput. ind. Engng., 1990, 19, 1/4, p. 81-91.
[BITR 82] , et , Hierarchical Production Planning: a Two Stage System, Opns. Res., 1982, 30, p. 232-251. | Zbl
[BRUC 91] , et , A Branch and Bound Algorithm for the Job Shop Scheduling Problem, Disc. Appl. Math. (à paraître). | Zbl
[BLAZ 83] , et , Scheduling Subject to Resource Constraints: Classification and Complexity, Disc. Appl. Math., 1983, 5, p. 11-24. | Zbl | MR
[BLAZ 86] , , et , Scheduling Under Resource Constraints: Deterministic Models, Annals of Opns. Res., J. C. Baltzer AG, Basel, 1986. | Zbl
[CARL 75] , Disjonctions dans les ordonnancements, RAIRO-Oper. Res., juin 1975, 2, p. 83-100. | Zbl | Numdam
[CARL 78] , Ordonnancements à Contraintes Disjonctives, RAIRO-Oper. Res., novembre 1978, 12, p. 333-351. | Zbl | MR | Numdam
[CARL 82 a] et , Financing and Scheduling, Opns. Res. Letters, avril 1982, 1, 2, p. 52-55. | Zbl
[CARL 82 b] et , Les Problèmes d'ordonnancement : un domaine très ouvert, RAIRO-Oper. Res., août 1982, p. 175-217. | Zbl | Numdam
[CARL 82 c] , The One Machine Problem, EJOR, 1982, p. 42-47. | Zbl
[CARL 84] , et , Modelling Scheduling Problems with Timed Petri Nets, Advances Studies in Petri Nets, Lecture Notes in Comput. Sci., Springer Verlag, september 1984. | Zbl | MR
[CARL 88 a] et , Les problèmes d'ordonnancements : modélisation, complexité, algorithmes, Masson, Paris, février 1988.
[CARL 88 b] et , Optimisation des plans de trame dans le système AMRT/CNC d'EUTELSAT, Annales des Télécomm., 1988, 43, 9-10, p. 506-521.
[CARL 89 a] et , Timed Petri Nets Schedules, Advances in Petri Nets 1988, Lecture Notes in Comput. Sci., Springer Verlag, january 1989, p. 62-84. | Zbl | MR
[CARL 89 b] et , A Branch and Bound Method for Solving the Job Shop Problem, Management Sci., february 1989, 35, 2, p. 164-176. | Zbl | MR
[CARL 89 c] , Scheduling under Financial Constraints, Advances in Project Scheduling (R. Slowinsky et J. Weglarz éds.), Elsevier science, april 1989, p. 187-224. | MR
[CARL 90] et , The Use of the Jackson Preemptive Schedule for Solving the Job Shop Problem, Annals of Opns. Res., 1990 (à paraître). | Zbl
[CARL 92] et éd., Project Management and Scheduling 2, EJOR, Special Issue (à paraître).
[CHO 81] et , Preemptive Scheduling of Independent Jobs with Release and Due Dates on Open, Flow and Job Shops, Opns Res., 1981, 29, p. 511-522. | Zbl | MR
[CHRE 83] , Les réseaux de Pétri temporisés, Thèse d'état, Université Paris-VI, 1983.
[CHRE 85] , Analyse des régimes transitoire et permanent d'un graphe d'événements temporisé, TSI, 1985, 4, 1, p. 127-142. | Zbl
[CHRE 89] , A Polynomial Algorithm to Optimally Schedule Tasks on a Virtual Distributed System Under Tree-Like Precedence Constraints, EJOR, 1989, 43, p. 225-230. | Zbl | MR
[CHRE 90 a] , Task Scheduling with Interprocessor Communication Delays, EJOR, 1992, 57, p. 348-354. | Zbl
[CHRE 90 b] , Complexity of Tree Scheduling with Interprocessor Communication Delays, Rapport M.A.S.I. n° 90.5, février 1990. | Zbl
[CHRE 91] , The Basic Cyclic Scheduling Problem with Deadlines, Disc. Appl. Math., 1991, 30, p. 109-123. | Zbl | MR
[CHRY 91] , et , An Approach to Short Interval Scheduling for Discrete Parts Manufacturing, Int. J. Comput. Integrated Manufacturing, 1991, 4, 3, p. 157-168.
[CHU 89] et , Minimisation de la somme des retards pour les problèmes d'ordonnancement à une machine, Rapport de Recherche INRIA n° 1023, avril 1989.
[CHU 90] , Nouvelles approches analytiques et concept de mémoire artificielle pour divers problèmes d'ordonnancement, Thèse d'Université, Université de Metz, septembre 1990.
[CHU 92 a] , et , A Splitting-up Approach to Simplify Job-Shop Scheduling Problems, Int. J. Prod. Res., 1992, 30, 4, p. 859-870. | Zbl | MR
[CHU 92 b] et , Some New Efficient Methods to Solve the n/1/ri/Σ Ti Scheduling Problems, EJOR (à paraître). | Zbl
[COFF 76] éd., Computer and Job-Shop Scheduling, J. Wiley & Son, New York, 299 p., 1976. | Zbl
[COHE 85] , , et , A Linear System Theoretic View of Discrete Event Processes and its Use for Performance Evaluation in Manufacturing, IEEE. Trans. on Automatic Control, 30, 3, p. 210-220. | Zbl | MR
[COLI 90] et , C.P.M. Scheduling with Small Interprocessor Communication Times, Opns. Res., 1990. | Zbl
[CONW 67] , et , Theory of Scheduling, Addison-Wesley Publishing Company, 294 p., 1967. | Zbl | MR
[COUZ 79] , Etude de l'existence de solutions pour certains problèmes d'ordonnancement, Thèse de Docteur-Ingénieur, Université Paul Sabatier, Toulouse, 1979.
[CYTR 84] , Compile-Time Scheduling and Optimization for Asynchronous Machines, PHD Thesis Univ. of Illinois, Urbana-Champaign, 1984.
[DANN 77] , A Evaluation of Flow-Shop Sequencing Heuristics, Management Sci., 1977, 23, 11, p. 1174-1182. | Zbl
[DEME 90] et , A Branch and Bound Procedure for the Multiple Constrained Resource Project Scheduling Problem, EURO WG-PMS, Compiègne, 1990. | Zbl
[DEMP 82] , et , Deterministic and Stochastic Scheduling, Reidel Dordrecht, 1982. | Zbl | MR
[DOGR 79] et , Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors, Management Sci., 1979, 25, 12, p. 1208-1216. | Zbl
[DU 90] et , Minimizing Total Tardiness on One Machine is N.P.-Hard, Math. Opns. Res., 1990, 15, p. 483-495. | Zbl | MR
[EISE 88] , Optimization of Horizontal Microcode Generation for Loop Structures, Proc. of the 1988 ACM Int. Conf. on Super-Computing, St Malo, France, juillet 1988, p. 453-465.
[ELMA 92] , Optimal Time-Cost Trade-off via Dynamic Programming, Project Management and Scheduling 2, EJOR, Special Issue (à paraître).
[ERSC 76 a] , Analyse sous contraintes et aide à la décision pour certains problèmes d'ordonnancement, Thèse d'état, Université Paul-Sabatier, Toulouse, 1976.
[ERSC 76 b] , et , Finding Some Essential Characteristics of the Feasible Solutions for a Scheduling Problem, Opns. Res., 1976, 24, p. 774-784. | Zbl | MR
[ERSC 79] , et , Potentiels sur un graphe non conjonctif et analyse d'un problème d'ordonnancement à moyens limités, RAIRO-Oper. Res., 1979, 13, 4, p. 363-378. | Zbl | MR | Numdam
[ERSC 80] , et , Characterizing the Set of Feasible Sequences for n Jobs to be Carried out on a Single Machine, EJOR, 1980, 4, p. 189-194. | Zbl
[ERSC 83] , , et , A New Dominance Concept in Scheduling n Jobs on a Single Machine with Ready Times and Due Dates, Opns. Res., 1983, 31, 1, p. 114-127. | Zbl
[ERSC 85] , et , Consistency of the Dissaggregation Process in Hierarchical Planning, Opns. Res., 1985, 34, p. 464-469. | Zbl
[ERSC 91] , et , Raisonnement temporel sous contraintes de ressource et problèmes d'ordonnancement, Revue d'intelligence artificielle, 1991, 5, p, 7-32.
[ESQU 87] , Règles et processus d'inférence pour l'aide à l'ordonnancement de tâches en présence de contraintes, Thèse de Doctorat, Université Paul-Sabatier, Toulouse, 1987.
[FALK 91] et , A Genetic Algorithm for Job Shop, Proc. of the 1991 IEEE International Conference on Robotics and Automation, Sacramento, California, avril 1991, p. 824-829.
[FISH 73] , Optimal Solution for Scheduling Problems Using Lagrange Multipliers, part 1, Opns. Res., 1973, 21, p. 1114-1127. | Zbl | MR
[FOLD 92] et , Generalizations of PERT Using the Network Model, Project Management and Scheduling 2, EJOR, Special Issue (à paraître).
[FONT 80] , Notion de dominance et son application à l'étude de certains problèmes d'ordonnancement, Thèse d'état, Université Paul Sabatier, Toulouse, 1980.
[FREN 82] , Sequencing and Scheduling: an Introduction to the Mathematics of the Job Shop, Horwood, Chichester, 1982. | Zbl | MR
[GAO 91] , et , A Petri Net Model for Fine Grain Loop Scheduling, Proc. of the 91 ACM-SIGPLAN conf. on Prog. Lang. Design. and Impl., Toronto, juin 1991, p. 204-218.
[GARC 85] et , Group Technology in Production Management: the Short Horizon Planning Level, J. Appl. Stoc. Model and Data Analysis, 1985, 1, p, 25-34. | Zbl
[GARC 86] et , A New Cross-Decomposition Algorithm: the GPM. Comparison with the Bond Energy Method, Control and Cybernetics, 1986, 15, 2, p. 155-165. | Zbl | MR
[GARE 79] et , Computers and Intractability: a Guide to the Theory of NP-Completeness, Freeman, San Francisco, 1979. | Zbl | MR
[GASP 91] et , Efficient Algorithms for Cyclic Scheduling, IBM Tech. Rep. RC 17068, août 1991.
[GILM 64] et , Sequencing a One-State Variable Machine: a Solvable Case of the Travelling Salesman Problem, Opns. Res., 1964, 12, p. 655-679. | Zbl | MR
[GLOV 75] , Surrogate Constraint Duality in Mathematical Programming, Opns. Res., 1975, 23, p. 434-451. | Zbl | MR
[GLOV 87] , Tabu Search Methods in Artificial Intelligence and Operations Research, ORSA, Artificial Intelligence Newletter, 1987, I.
[GOLD 89] , Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley, Reading, MA, 1989. | Zbl
[GONZ 76] et , Open-Shop Scheduling to Minimize Finish Time, J.A.C.M., 1976, 23, 4, p. 665-679. | Zbl | MR
[GONZ 78] et , Flowshop and Jobshop Schedules: Complexity and Approximation, Opns. Res., 1978, 26, 1, p. 36-52. | Zbl | MR
[GRAB 82] , A New Algorithm of Solving the Flow Shop Problem, G. FLEICHTINGER et P. KALL ed., Opns. Res. in Progress, Reidel, Dordrecht, 1982, p. 57-75. | Zbl | MR
[GRAH 79] , , et , Otimisation and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals Disc. Math., 1979, 5, p. 287-326. | Zbl | MR
[HAN 92] , Algorithmes de résolution exacte et heuristique pour les problèmes d'ordonnancement en flowshop, Thèse de Doctorat, Ecole Centrale Paris, France, 156 p., 1992.
[HANE 89] , Microprogramming Using Timed Petri Nets, Advances in Petri Nets, 1989, Springer Verlag.
[HANE 90] , Les tables de réservation numériques : un outil de résolution de certains problèmes d'ordonnancement cycliques, RAIRO-Oper. Res., avril 1990. | Zbl | Numdam
[HANE 91] , Study of a NP-Hard Scheduling Problem: the Recurrent Job-Shop, EJOR (à paraître). | Zbl
[HANE 92] et , Cyclic Scheduling on Parallel processors: Problem Structure and Heuristic, Rapport CRI, juin 1992.
[HERZ 90] et , The Tabu Search Metaheuristic: How to Used It, Ann. of Math. and Artificial Intelligence, 1990, 1, p. 111-121. | Zbl
[HHOO 92] , Single-Machine Bicriteria Scheduling, Doctoral thesis, CWI, Amsterdam, 1992. | Zbl
[HWA 89] , , et , Scheduling Precedence Graphs in Systems with Interprocessor Communication Times, SIAM J. Comput., avril 1989, 18, p. 244-257. | Zbl | MR
[JACK 55] , Scheduling a Production Line to Minimize Maximum Tardiness, Research Report 43, Management Science Research Project, University of California, Los Angeles, 1955.
[JHAV 91] et , A Heuristic Algorithm to Schedule Work in the Repair Industry, Int. J. Prod. Res., 1991, 29, 12, p. 2393-2405. | Zbl
[JOHN 54] , Optimal Two- and Three- Stage Production Schedules with Setup Times Included, Nav. Res. Log. Q., 1954, 1, 1, p. 61-68.
[KARP 67] , et , The Organisation of Computations for Uniform Recurrence Equations, J. of the A.C.M., 1967, 14, 3, p. 563-590. | Zbl | MR
[KIRK 82] , et , Optimization by Simulated Annealing, Res. Rep. R.C. 9335, IBM Thomas J. Watson, Center Yorktown, NY, 1982.
[KOGG 81] , The Architecture of Pipelined Computers, New York, McGraw Hill, 1981. | Zbl
[KUSI 85 a] , et , Grouping Problem in Scheduling Flexible Manufacturing Systems, Robotica, 1985, 3, p. 245-252.
[KUSI 85 b] , The Part Families Problem in Flexible Manufacturing Systems, Ann. of Opns. Res., 1985, 3, p. 279-300.
[KUSI 86] , Efficient Implementation of Johnson's Scheduling Algorithm, IIE Trans., 1986, 18, p. 215-216.
[KUSI 88] et , Expert Systems for Planning and Scheduling Manufacturing Systems, EJOR, 1988, 34, p. 113-130. | MR
[LAM 87] , A Systolic Array Optimizing Compiler, PhD. Dissertation, Carnegie Mellon University, 1987.
[LAWL 86] , , et , The Travelling Salesman Problem, John Wiley, 1986. | Zbl | MR
[LEGA 89] , Un système interactif d'aide à la décision pour l'ordonnancement et le pilotage en temps réel d'atelier, Thèse de Doctorat, Université Paul-Sabatier, Toulouse, 1989.
[LEI 89] et , On the Optimal Cyclic Schedules of Single Hoist Electroplating Processes, GSM Working paper n° 89-06, Rutgers University, New-Jersey, 1989.
[LEIS 90] , Flowshop Problems with Limited Buffer Storage, Int. J. Prod. Res., 1990, 28, 11, p. 2085-2100. | Zbl
[LENS 77] , Sequencing by Enumerative Methods, Math. Cent. tracts 69, Centre for Mathematical and Computer Science, Amsterdam, 1977. | Zbl | MR
[LIN 71] et , An Effective Heuristic Algorithm for the Travelling Salesman Problem, Opns. Res., 1971, 21, p. 498-516. | Zbl | MR
[McMA 71] , A Study of Algorithms for Industrial Scheduling Problem, Ph. D. Thesis, University of South Wales.
[McMA 92] , The Two-Machine Maximum Flow-Time Problem with Arbitrary Precedence Relations, EJOR (à paraître).
[MATS 88] , Cyclic Sequencing Problems in the Two-Machine Permutation Flow Shop: Complexity, Worst Case and Average Case Analysis, Graduate School of Business, University of Texas, Austin, january 1988. | Zbl
[MEGU 88] , Méthodes de classification pour la constitution d'îlots de fabrication et l'ordonnancement, Thèse de Doctorat de l'I.N.S.A., Toulouse, 1985.
[MONM 83] et , A Concise Survey of Efficiently Solvable Special Cases of the Permutation Flow-Shop Problem, RAIRO-Oper. Res., 1983, 17, 2, p. 105-109. | Zbl | MR | Numdam
[MUNI 91 a] , Résolution d'un problème d'ordonnancement cyclique à itérations indépendantes et contraintes de ressource, RAIRO-Oper. Res., 1991, 25, 2, p. 161-182. | Zbl | MR | Numdam
[MUNI 91 b] , Contribution à l'étude des problèmes d'ordonnancement cycliques, Thèse de l'Université Paris-VI, février 1991.
[MUNS 90] et , Scheduling Loops on Processors: Algorithms and Complexity, SIAM J. of Comput., 1990, 19, p. 728-741. | Zbl | MR
[NABE 73] , Algorithms and Reliable Heuristics Programs for MultiProjects Scheduling with Resource Constraints and Related Parallel Scheduling, University of Electrocommunication, Chofu, Tokyo, Japon, 1973.
[NAWA 83] , et , A Heuristic Algorithm for the m Machine, n Job Flowshop Sequence Problem, Omega, 1983, 11, 1, p. 91-95.
[PADB 86] et , Optimization of a 532-City Symmetric Travelling Salesman Problem, AFCET, Journées du 20e anniversaire du groupe combinatoire A.F.C.E.T./I.N.R.I.A., décembre 1986.
[PARK 77] , et , On the Case of a Vehicle Routing Algorithm for the Parallel Processor Problem with Sequence Dependent Changeover Costs, AIIE Trans., 1977, 9, 2, p. 155-160.
[PATE 76] et , Improving the Throughput of a Pipeline by Insertion of Delays, IEEE 3rd Ann. Symp. on Computers Architecture, january 1976.
[PICO 91] , Two New NP-Complete Scheduling Problems with Communication Delays and Unlimited Number of Processor, Rapport MASI n° 91-24, 1991.
[PINS 88] , Le problème de Job Shop, Thèse de Doctorat de l'Université Paris-VI, 1988.
[PORT 88] , Méthodes de décomposition spatiales et temporelles en ordonnancement de la production, RAIRO-APII, 1988, 22, 5, p. 439-451. | Zbl | MR
[POTT 87] et , Dynamic Programming and Decomposition Approaches for the Single Machine Total Tardiness Problem, EJOR, 1987, 32, p. 405-414. | Zbl
[PRIN 88] , Problèmes d'optimisation de ressources dans les systèmes de télécommunications par satellite utilisant l'A.M.R.T. (Accès Multiple à Répartition dans le Temps), Thèse de Doctorat de l'Université de Paris-VI, juin 1988.
[PROU 87] , , et , Une heuristique pour le problème d'ordonnancement statique de type n/m/flowshop avec prise en compte des temps de montage et démontage d'outils, 2e Conférence Internationale Systèmes de Production, I.N.R.I.A., Paris, 1987, p. 125-141. | Zbl
[PROU 89] , , et , Un logiciel de planification pour outil à deux étages avec changement de fabrication, 1989, Actes du Colloque International « Logistique », A.F.C.E.T., Paris, p. 125-132.
[PROU 91 a] , et , Flowshop Scheduling with Setup, Processing and Removal Times Separated, Int. J. Prod. Res., 1991, 29, 3, p. 479-493.
[PROU 91 b] , et , Le paradoxe de l'Interprogrammation : la diversité des logiciels au service d'une intégration efficace, 1991, Actes du 3e Congrès International de Génie Industriel, GGI, Tours, p. 1157-1166.
[PROU 92] , Influence des idées de S. M. Johnson sur la résolution de problèmes d'ordonnancement de type n/m/F, contraintes diverses/Cmax, 1992, Rapport Interne, Laboratoire d'Informatique/E3i, Université de Tours, 150 p.
[QUIN 89] et , Algorithmes et architectures systoliques, Etudes et Recherches en Informatique, Masson, 1989.
[RADH 86] , A Heuristic Algorithm for Group Scheduling, Proc. of the Int. Industrial Engineering Conference, Institute of Industrial Engineers, 1986, p. 229-236.
[RINN 76] , Machine Sequencing Problems: Classification, Complexity and Computation, Nijhoff, The Hague, 1976.
[ROCK 82] et , Machine Agregation Heuristics in Shop Scheduling, 1982, Bericht 82-11, Fachbereich 20, Mathematich Technische Universitat, Berlin. | Zbl
[ROUN 88] , Cyclic Schedules for Job Shops with Identical Jobs, School of Operation Research and Industrial Engineering, Cornell University, T.R. n° 766, juillet 1988. | Zbl
[ROY 70] , Algèbre moderne et théorie des graphes, tome 2, Dunod, Paris, 1970. | MR
[SAOU 90] et , Computability of Recurrence Equations, Rapport de recherche I.N.R.I.A. n° 1203, 1990. | Zbl
[SERA 89] et , A Mathematical Model for Periodic Scheduling Problems, S.I.A.M. J. of Disc. Math., 1989, 2, 4. | Zbl | MR
[SLOW 78] , Scheduling Preemptable Tasks on Unrelated Processors with Additionnal Ressources to Minimize Schedule Lenght, Lect. Notes on Comput. Sci., Springer-Verlag, 1978, p. 536-547. | MR
[SLOW 82] , Multiobjective Network Scheduling with Efficient Use of Renewable and Non-Renewable Resources, EJOR, 1982, 7, 3, p. 265-273. | Zbl | MR
[SLOW 89] et éd., Advances in Project Scheduling, Elsevier Science, Amsterdam, avril 1989. | MR
[SMIT 56] , Various Optimizers for Single-Stage Production, Nav. Res. Log. Quart., 1956, 3, p. 59-66. | MR
[SRIN 71] , A Hybrid Algorithm for the One-Machine Sequencing Problem to Minimize Total Tardiness, Nav. Res. Log. Quart., 1971, 18, 3, p. 317-327. | Zbl | MR
[SUMI 87] et , Scheduling Parallel Processors: an Integer Linear Programming Based Heuristic for Minimizing Setup Time, Int. J. Prod. Res., 1987, 25, 5, p. 761-771. | Zbl
[TALB 78] et , An Efficient Integer Programming with Network Cuts for Solving Resources Constrained Scheduling Problems, Management Sci., 1978, 245, p. 1163-1174. | Zbl
[TAVA 90] et éd., Project Management and Scheduling, EJOR, Special Issue 1, novembre 1990.
[THOM 80] Aide à la décision pour l'ordonnancement d'atelier en temps réel, Thèse de Doctorat, Université Paul-Sabatier, Toulouse, 1980.
[VELD 91] , Machine Scheduling and Lagrangian Relaxation, Doctoral Thesis, CWI, Amsterdam, 1991.