@article{RO_1999__33_2_117_0,
author = {Vignier, A. and Billaut, J.-C. and Proust, C.},
title = {Les probl\`emes d'ordonnancement de type {\guillemotleft} flow-shop {\guillemotright} hybride : \'etat de l'art},
journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
pages = {117--183},
year = {1999},
publisher = {EDP Sciences},
volume = {33},
number = {2},
mrnumber = {1716954},
zbl = {0960.90042},
language = {fr},
url = {https://www.numdam.org/item/RO_1999__33_2_117_0/}
}
TY - JOUR AU - Vignier, A. AU - Billaut, J.-C. AU - Proust, C. TI - Les problèmes d'ordonnancement de type « flow-shop » hybride : état de l'art JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 1999 SP - 117 EP - 183 VL - 33 IS - 2 PB - EDP Sciences UR - https://www.numdam.org/item/RO_1999__33_2_117_0/ LA - fr ID - RO_1999__33_2_117_0 ER -
%0 Journal Article %A Vignier, A. %A Billaut, J.-C. %A Proust, C. %T Les problèmes d'ordonnancement de type « flow-shop » hybride : état de l'art %J RAIRO - Operations Research - Recherche Opérationnelle %D 1999 %P 117-183 %V 33 %N 2 %I EDP Sciences %U https://www.numdam.org/item/RO_1999__33_2_117_0/ %G fr %F RO_1999__33_2_117_0
Vignier, A.; Billaut, J.-C.; Proust, C. Les problèmes d'ordonnancement de type « flow-shop » hybride : état de l'art. RAIRO - Operations Research - Recherche Opérationnelle, Tome 33 (1999) no. 2, pp. 117-183. https://www.numdam.org/item/RO_1999__33_2_117_0/
[ag-1995] , , et , Hybrid flowshop problems, a decomposition based heuristic approach. In International Conference on Industrial Ingineering and Production Management (IEPM'95), avril 1995, Marrakech (Maroc), FUCAM/IFIP/INRIA, p. 43-56.
[al-1997] , , , et , Compu-search Methodologies II : Scheduling using Genetic Algorithms and Artificial Neural Networks, dans The Planning and Scheduling of Production System, A. Artiba et S. E. Elmaghraby, Chapman & Hall edition, 1997, p. 301-336.
[ba-1974] , Introduction to sequencing and scheduling, John Willey & Sons, Inc., 1974.
[ba-1987] , , et , Une caractérisation analytique des ordonnancements admissibles sous contraintes hétérogènes en flow-shop, RAIRO-APII, 1987, 25, p. 87-102. | Zbl
[be-1982] , et , Mathematical aspects of scheduling and applications, volume 4 of International Series in Modern Applied Mathematics and Computer Science, Pergamon Press edition, 1982. | Zbl | MR
[ro-1996] et , A new method for workshop real time scheduling, Int. J. Prod. Res., 1996, 34, n° 6, p. 1555-1579. | Zbl
[bl-1994] , , et , Scheduling in Computer and Manufacturing Systems, Springer-Verlag edition, 1994. | Zbl
[bo-1996] , Planification et ordonnancement d'une succession d'ateliers avec contraintes, PhD thesis, Université Claude Bernard-Lyon 1, décembre 1996.
[br-1991] et , Branch and bound algorithm for the flow shop with multiple processors, European Journal of Operational Research, 1991, 57, p. 88-99. | Zbl
[br-1975] , et , Scheduling with earliest start and due date constraints on multiple machines, Naval Research Logistics Quarterly, 1975, 22, n° 1, p. 165-173. | Zbl
[bu-1973] et , A scheduling model for computer Systems with two classes of processors, Sagomore Computer Conference on Parallel Processing, 1973.
[ca-1970] , et , A heuristic algorithm for the n job, m machine sequencing problem, Management Science, 1970, 16, n° 10, p. B630-B637. | Zbl
[Ca-1988] et , Problèmes d'ordonnancement (modélisation/complexité/algorithmes), Études et Recherches en Informatique, Masson édition, 1988.
[ca-1987] , Scheduling jobs with release dates and tails on identical machines to minimize the makespan, European Journal of Operational Research, 1987, 29, p. 298-306. | Zbl | MR
[ch-1990] et , Schedule generation in a dynamic job shop, Int. J. Prod. Res., 1990, 28, n° 1, p. 65-74.
[ch-1995] , Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage, Journal of Operational Research Society, 1995, 46, n° 2, p. 234-244. | Zbl
[co-1994] Collectif, « Ordonnancement et Entreprises : applications concrètes et outils pour le futur ». In Journées d'études, Toulouse (France), CNRS/GdR Automatique/pôle SED/GT3. juin 1994, 315 p.
[de-1991] et , The two stage flowshop scheduling problem with m machines at each stage, Journal of Information and Optimization Sciences, 1991, 72, p. 407-471. | Zbl
[dj-1996] et , Genetic algorithm operators restricted to precedent constraints set: genetic algorithm designs with or without branch and bound approach for solving scheduling problems with disjunctive constraints, Pékin (Chine), IEEE/Systems, Man and Cybernetics (SMC'96), octobre 1996, 4, p. 2922-2927.
[fo-1996] , , , et , A production scheduling case study in a chemical firm using metaheuristics, European Journal of Operational Research, 1996, soumis.
[fo-1993] , et , AMPL: A Modeling Language for Mathematical Programming, The Scientific Press edition, 1993. | Zbl
[go-1993] Les problèmes d'ordonnancement, RAIRO Rech. Opér., 1993, 27, n° 1, p. 77-150. | MR | Numdam
[gr-1979] , , et , Optimization and approximation in deterministic sequencing and scheduling theory: a survey, Ann. Discrete Math., 1979, 5, p. 287-326. | Zbl | MR
[gr-1966] , Bounds for certain multiprocessing anomalies, The Bell System Technical Journal, 1966, 45, p. 1563-1581. | Zbl
[gu-1995] , et , Minimisation du plus grand retard ou de la plus grande date de fin dans les problèmes d'ordonnancement de type flowshop hybride. In Journées d'études: « Affectation et Ordonnancement », Tours (France), CNRS/GdR Automatique/pôle SED/GT3, septembre 1995, p. 95-111.
[gu-1996] , , et , A computational study of heuristics for two-stage flexible flowshops, Int J. Prod. Res., 1996, 34, n° 5, p. 1399-1415. | Zbl
[gup-1995] , et , Scheduling a two-stage hybrid flow shop with parallel machines at the first stage, Mathematics of Industrial Systems (Annals of operations research), 1995, à paraître. | Zbl
[gu-1991] et , Schedules for a two-stage hybrid flowshop with parallel machines at the second stage, Int. J. Prod. Res., 1991, 29, n° 7, p. 1489-1502.
[gu-1994] et , Scheduling a two-stage hybrid flowshop with separable setup and removal times, European Journal of Operational Research, 1994, 77, p. 415-428. | Zbl
[gu-1988] , Two-stage hybrid flowshop scheduling problem, Operational Research Society, 1988, 39, n° 4, p. 359-364. | Zbl
[ha-1979] et , Le cycle de vie du processus de production (i) et (ii), Harvard-L'expansion, automne 1979, p. 23-32, 99-110.
[he-1996] et , A constraint hybrid flowshop problem. In Workshop on Production Planning and Control (WPPC), septembre 1996, Mons, Belgique, FUCaM/EIASM/ICM, p. 303-306.
[ho-1974] , Some simple scheduling algorithms, Naval Research Logistics Quarterly, 1974, 21, p. 177-185. | Zbl | MR
[hu-1992] et , Performance of priority rules in a due date flow shop, OMEGA, 1992, 20, n° 1, p. 73-89.
[hu-1994] et , Comparative performance analysis of priority rules in a constrained flow shop with multiple processors environment, European Journal of Operational Research, 1994, 72, p. 102-114. | Zbl
[ig-1965] et , Application of the branch and bound technique to some flow-shop scheduling problems, Operations Research, 1965, 13, n° 3, p. 400-412. | MR
[jo-l954] , Optimal two and three stage production schedules with setup times included, Naval Research Logistics Quarterly, 1954, 1, n° 1, p. 61-68.
[ka-1997] , et , A comparison of scheduling rules in static and dynamic hybrid flow Systems, Int. J. Prod. Res., 1997, 35, n° 5, p. 1359-1384. | Zbl
[la-1978] , et , A general bounding scheme for the permutation flow-shop problem, Operations Research, 1978, 26, n° 1, p. 53-67. | Zbl
[la-1987] , Interstage transportation planning in the deterministic flow-shop environment, Operations Research, 1987, 35, n° 4, p. 556-564.
[la-1994] et , Planification et ordonnancement intégrés dans un atelier de type jobshop, Bulletin de liaison n° 8 du CNRS/GdR Automatique/Ple SED/GT3, avril 1994.
[la-1982] , Pratique de Gestion de Production, Les Editions d'Organisation, 1982.
[la-1989] , , et , Sequencing and scheduling: algorithms and complexity, Report BS-R8909, Center for Mathematics and Computer Science, The Netherlands, Amsterdam, 1989, 70 p.
[lee-1993] , et , Minimizing the makespan in the 3-machine assembly flowshop scheduling problem, Management Science, 1993, 39, n° 5, p. 616-625. | Zbl
[lee-1994] et , Minimizing makespan in hybrid flowshop, Operations Research Letters, 1994, 16, n° 3, p. 149-158. | Zbl | MR
[le-1992] , L'intégration : quels impacts surla spécification d'un système de gestion de production assistée par ordinateur?, PhD thesis, Université de Lyon I-INSA, 1992.
[le-1979] et , Un défi à la fonction de la production, Revue Française de Gestion, Janvier-Février 1979, p. 9-14.
[le-1994] , et , Characterization of feasible schedules for the flow-shop problem: a decomposition approach. In European Workshop on Integrated Manufacturing Systems Engineering (IMSE'94), Grenoble (France), INRIA, décembre 1994, p. 307-315.
[li-1996] , A hybrid two-stage flowshop with part family, batch production, major and minor setups, European Journal of Operational Research, 1996à paraître. | Zbl
[ma-1993] et , Addressing the gapin scheduling research: a review of optimization and heuristic methods in production scheduling, Int. J. Prod. Res., 1993, 31, n° 1, p. 59-79.
[na-1959] , Scheduling with deadlines and loss functions, Management Science, 1959, 6, p. 1-12 | Zbl | MR
[mi-1959] , Sequencing n jobs on two machines with arbitrary time lags, Management Science, 1959, 5, n° 3, p. 293-298. | Zbl | MR
[mo-1983] et , A concise survey of efficiently solvable special cases of the permutation flow-shop problem, RAIRO Rech. Opér., 1983, 17, n° 2, p. 105-119. | Zbl | MR | Numdam
[na-1987] et , A comparison of sequencing rules for a two-stage hybrid flowshop, Decision Sciences, 1987, 18, p. 250-265.
[na-1984] et , Scheduling in a two stage manufacturing process, Int. J, Prod. Res., 1984, 22, n° 4, p. 555-564.
[na-1983] , et , A heuristic algorithm fort the m machine, n job flowshop sequencing problem, OMEGA, 1983, 11, n° 1, p.91-95.
[pa-1961] , An approach to the scheduling of jobs on machines, J. Roy. Statist. Soc., 1961, 23, p. 484-492. | MR
[pa-1979] , A production scheduling problem in the glass-container industry, Operations Research, 1979, 27, n° 2, p. 290-302.
[po-1996] , , et , Some hybrid flowshop scheduling by crossing branch and bound and genetic algorithms. In 5th International Workshop on Project Management and Scheduling (PMS'96), Poznan (Pologne), avril 1996, p. 186-189.
[po-1988] , Méthodes de décomposition spatiales et temporelles en ordonnancement de la production, RAIRO-APII, 1988, 22, n° 5, p. 439-451. | Zbl | MR
[pr-1995] et , Planification de production dans un contexte de flow-shop hybride à deux étages : conception et interprogrammation d'ARIANNE 2000, RAPA, 1995, 8, n° 5, p. 715-734.
[pr-1992] , Using Johnson's algorithm for solving flowshop scheduling problems. In Summer school on Scheduling Theory andits Applications, Bonas (France), INRIA/C3/COMETT, octobre 1992, p. 297-342.
[ra-1992b] et , A multi-stage parallel processor flowshop problem with minimum flowtime, European Journal of Operational Research, 1992, 57, p. 111-122. | Zbl
[ra-1992a] et , Scheduling in n-jobs, m stage flowshop with parallel processors to minimize makespan, Int. J. of Production Economics, 1992, 27, p. 137-143.
[ri-1995] , , et , Solving scheduling problems using petri nets and constraints logic programming. In International Conference on Emerging Technologies and Factory Automation (ETFA'95), Vol. 1, Paris (France), INRIA/IEEE, octobre 1995, p. 59-68.
[ri-1976] , Machine scheduling problems: classification, complexity and computations, Nijhoff, The Hague, 1976. | Zbl
[sa-1973] , A solution to a special class of flow shop scheduling problem. In Symposium on the Theory of Scheduling and its Applications Springer-Verlag, Berlin (Allemagne), 1973, p. 83-91. | Zbl | MR
[sa-1992] , Conception et analyse d'algorithmes de liste en ordonnancement préemptif, PhD thesis, Université de Paris VI, september 1992.
[sa-1995] , et , Global lower bounds for flow shop with multiple processors, European Journal of Operational Research, 1995, 80, p. 112-120. | Zbl
[saw-1993] , A scheduling algorithm for flexible flow lines with limited intermediate buffers, Applied Stochastic Models and Data Analysis, 1993, 9, p. 127-138.
[saw-1995] , Scheduling flexible flow lines with no in-process buffers, Int. J. Prod. Res., 1995, 33, n° 5, p. 1357-1367. | Zbl
[sh-1972] et , A scheduling strategy for the flowshop problem in a System with two classes of processors. In Conference on Information and Systems Science, 1972, p. 645-649.
[sh-1990] , et , Models and algorithm for a two-stage production process, Production Planning and Control, 1990, 1, n° 1, p. 27-39.
[sr-1989] et , Scheduling algorithms for flexible flow-shops: Worst and average case performance, European Journal of Operational Research, 1989, 43, p. 143-160. | Zbl | MR
[st-1990] et , On the Srikar-Ghosh MILP model for the nxm SDST flowshop problem, Int. J. Prod. Res., 1990, 28, n° 10, p. 1817-1830.
[su-1983] et , Sequency on two and three machines with setup, processing and removal times separated, Int. J. Prod. Res., 1983, 21, n° 5, p. 723-732. | Zbl
[sz-1987] et , A flow-shop problem with sequence-dependant additive setup times, Naval Research Logistics Quarterly, 1987, 23, p. 619-627. | Zbl | MR
[sz-1983] , Flowshop problems with time lags, Management Science, 1983, 29, n° 4, p. 477-481. | Zbl
[to-1977] , Sequencing n jobs on m machines to minimize maximum tardiness: a branch and bound solution, Management Science, 1977, 23, n° 9, p. 1016-1019. | Zbl
[va-1994] , Minimizing the makespan in a multiprocessor flow shop, Master's thesis, avril 1994, 37 p.
[vi-1995] , et , Les problèmes de flow-shop hybride : état de l'art, Rapport Interne 155, LI/E3i/Univ. de Tours, mai 1995, 100 p.
[vi-1996a] , et , Solving k-stage hybrid flowshop scheduling problems. In Multiconference on Computational Engineering in Systems Applications (CESA'96), Symposium on Discrete Events and Manufacturing Systems (IEEE-SMC /IMACS), Lille (France), 1996, p. 250-258.
[vi-1996b] , , et , Resolution of some two stage hybrid flowshop scheduling problems, Pékin (Chine), IEEE/Systems, Man and Cybernetics (SMC'96), octobre 1996, p. 2934-2941.
[vi-1996c] , , et , A branch and bound approach to minimize the total completion time in a k-stage hybrid flowshop. In 5th Internationnal Conference on Emerging Technologies and Factory Automation (ETFA'96), Hawaii (USA), IEEE/SICE, novembre 1996, 1, p. 215-220.
[wi-1985] , Scheduling algorithms for flexible flow lines, IBM J. Res. Develop., juillet 1985, 29, n° 4, p. 401-412.
[wi-1988] , An adaptable scheduling algorithm for flexible flow line, OpSearch, 1988, 36, n° 3, p. 445-453. | Zbl






