A deteriorating food preservation supply chain model with downstream delayed payment and upstream partial prepayment
RAIRO. Operations Research, Tome 56 (2022) no. 1, pp. 331-348

This paper investigates a food supply chain model consisting of the supplier, food producer and multi-retailer of a deteriorating item under fully delay-in-payment and partial advance payment scheme. The deterioration rate of raw material is dependent on temperature and other environmental factors with respect to time. Here, the food producer prepares food after collecting the raw material from the supplier and then storing it in cold storage. The refrigeration cost is dependent on the occupied volume in the cold storage (where the products are preserved for freshness) and power consumption. The supplier offers delay-in-payment to stimulate the food producer to buy more raw material (which minimizes the holding cost and earns more revenues), whereas the food producer takes the partial advance payment on purchase cost from the retailers to ensure the order quantity. A mathematical model is developed to obtain optimal production time and the optimal number of deliveries so that the average profit of the food producer is maximum. Finally, a numerical example and sensitivity analysis of the key parameters are provided to illustrate and test the feasibility of the proposed model.

DOI : 10.1051/ro/2021172
Classification : 90B05, 90B15, 90B25, 90B30, 90B50
Keywords: Supply chain, deteriorating items, delay-in-payment, advance payment
@article{RO_2022__56_1_331_0,
     author = {Ghosh, Prasanta Kumar and Kumar Manna, Amalesh and Dey, Jayanta Kumar and Kar, Samarjit},
     title = {A deteriorating food preservation supply chain model with downstream delayed payment and upstream partial prepayment},
     journal = {RAIRO. Operations Research},
     pages = {331--348},
     year = {2022},
     publisher = {EDP-Sciences},
     volume = {56},
     number = {1},
     doi = {10.1051/ro/2021172},
     mrnumber = {4376278},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2021172/}
}
TY  - JOUR
AU  - Ghosh, Prasanta Kumar
AU  - Kumar Manna, Amalesh
AU  - Dey, Jayanta Kumar
AU  - Kar, Samarjit
TI  - A deteriorating food preservation supply chain model with downstream delayed payment and upstream partial prepayment
JO  - RAIRO. Operations Research
PY  - 2022
SP  - 331
EP  - 348
VL  - 56
IS  - 1
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2021172/
DO  - 10.1051/ro/2021172
LA  - en
ID  - RO_2022__56_1_331_0
ER  - 
%0 Journal Article
%A Ghosh, Prasanta Kumar
%A Kumar Manna, Amalesh
%A Dey, Jayanta Kumar
%A Kar, Samarjit
%T A deteriorating food preservation supply chain model with downstream delayed payment and upstream partial prepayment
%J RAIRO. Operations Research
%D 2022
%P 331-348
%V 56
%N 1
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2021172/
%R 10.1051/ro/2021172
%G en
%F RO_2022__56_1_331_0
Ghosh, Prasanta Kumar; Kumar Manna, Amalesh; Dey, Jayanta Kumar; Kar, Samarjit. A deteriorating food preservation supply chain model with downstream delayed payment and upstream partial prepayment. RAIRO. Operations Research, Tome 56 (2022) no. 1, pp. 331-348. doi: 10.1051/ro/2021172

[1] A. K. Bhunia and M. Maiti, An inventory model of deteriorating items with lot-size dependent replenishment cost and linear trend in demand. Appl. Math. Model. 23 (1999) 301–308. | Zbl | DOI

[2] A. K. Bhunia and A. A. Shaikh, An application of PSO in a two-warehouse inventory model for deteriorating item under permissible delay in payment with different inventory policies. Appl. Math. Comput. 256 (2015) 831–850. | MR | DOI

[3] A. Cambini and L. Martein, Generalized Convexity and Optimization: Theory and Applications. Lecture Notes in Economics and Mathematical Systems. Vol. 616. Springer (2009). | MR | Zbl

[4] Y.-R. Chen and C.-Y. Dye, Application of particle swarm optimization for solving deteriorating inventory model with fluctuating demand and controllable deterioration rate. Int. J. Syst. Sci. 44 (2013) 1026–1039. | MR | Zbl | DOI

[5] L.-H. Chen and F.-S. Kang, Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme. Eur. J. Oper. Res. 205 (2010) 47–58. | Zbl | DOI

[6] M. G. Corradini and M. Peleg, Prediction of vitamins loss during non-isothermal heat processes and storage with non-linear kinetic models. Trends Food Sci. Technol. 17 (2006) 24–34. | DOI

[7] S. C. Das, A. K. Manna, M. S. Rahman, A. A. Shaikh and A. K. Bhunia, An inventory model for non-instantaneous deteriorating items with preservation technology and multiple credit periods-based trade credit financing via particle swarm optimization. Soft Comput. 25 (2021) 5365–5384. | DOI

[8] A. Diabat, A. A. Taleizadeh and M. Lashgari, A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial back ordering for deteriorating items. J. Manuf. Syst. 45 (2017) 322–342. | DOI

[9] C.-Y. Dye, The effect of preservation technology investment on a non-instantaneous deteriorating inventory model. OMEGA Int. J. Manage. Sci. 41 (2013) 872–880. | DOI

[10] C.-Y. Dye and T.-P. Hsieh, An optimal replenishment policy for deteriorating items with effective investment in preservation technology. Eur. J. Oper. Res. 218 (2012) 106–112. | MR | Zbl | DOI

[11] M. E. Ferguson and M. E. Ketzenberg, Information Sharing to Improve Retail Product Freshness of Perishables, 3rd edition. Georgia Institute of Technology (2005).

[12] P. K. Ghosh, A. K. Manna, J. K. Dey and S. Kar, Supply chain coordination model for green product with different payment strategies: a game theoretic approach. J. Cleaner Prod. 290 (2021) 125734. | DOI

[13] P. K. Ghosh, A. K. Manna, J. K. Dey and S. Kar, An EOQ model with backordering for perishable product under multiple advanced and delayed payments policies. J. Manage. Anal. (2021) 1–12. Doi: . | DOI

[14] S. K. Goyal, Economic order quantity under the condition of permissible delay in payments. J. Oper. Res. Soc. 36 (1985) 335–338. | Zbl | DOI

[15] M. Gupta, S. Tiwari and C. K. Jaggi, Retailer’s ordering policies for time-varying deteriorating items with partial backlogging and permissible delay in payments in a two-warehouse environment. Ann. Oper. Res. 295 (2020) 139–161. | MR | DOI

[16] F. W. Harris, How many parts to make at once, Factory. Mag. Manage. 10 (1913) 135–136.

[17] Y. He and Y. Huang, Optimizing inventory and pricing policy for seasonal deteriorating products with preservation technology investment. J. Ind. Eng. 2013 (2013) 1–7.

[18] M. A. A. Khan, A. A. Shaikh, G. C. Panda and I. Konstantaras, Two-warehouse inventory model for deteriorating items with partial backlogging and advance payment scheme. RAIRO-Oper. Res. 53 (2019) 1691–1708. | MR | Zbl | Numdam | DOI

[19] R. Li, Y.-L. Chan, C.-T. Chang and L. E. Cárdenas-Barrón, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. | DOI

[20] G. C. Mahata, An EPQ-based inventory model for exponentially deteriorating items under retailer partial trade credit policy in supply chain. Expert Syst. App. 39 (2012) 3537–3550. | DOI

[21] A. K. Manna, J. K. Dey and S. K. Mondal, Effect of inspection errors on imperfect production inventory model with warranty and price discount dependent demand rate. RAIRO-Oper. Res. 54 (2020) 1189–1213. | MR | Numdam | DOI

[22] R. Martin, China must improve its cool supply chain to keep pace with demand for fresh food. http://theloadstar.co.uk/coolstar/china-mustimprove-its-cool-supply-chain-to-keep-pace-with-demand-for-fresh-food (2015).

[23] G. D. Orris and A. J. Whitehead, Hazard analysis and critical control point (HACCP) as a part of an overall quality assurance system in international food trade. Food Control 11 (2000) 345–351. | DOI

[24] Y. Qin, J. Wang and C. Wei, Joint pricing and inventory control for fresh produce and foods with quality and physical quantity deteriorating simultaneously. Int. J. Prod. Econ. 152 (2014) 42–48. | DOI

[25] H. Ronald, G. Schmidt and E. Rodrick, Definition of food safety. In: Food Safety Handbook, Wilely-IEEE3-7 (2005).

[26] N. H. Shah, M. Y. Jani and U. Chaudhari, Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand. Math. Comput. Model. Dyn. Syst. 24 (2017) 1–11. | MR | DOI

[27] K. Skouri and S. Papachristos, A continuous review inventory model with deteriorating items time varying demand linear replenishment cost partially time varyingbacklogging. Appl. Math. Model. 26 (2002) 603–617. | Zbl | DOI

[28] K. Skouri, I. Konstantaras, S. Papachristos and I. Ganas, Inventory models with ramp type demand rate, partial backlogging and Weibull deterioration rate. Eur. J. Oper. Res. 192 (2009) 79–92. | MR | Zbl | DOI

[29] D. Smith, Design and management concepts for high care food processing. Br. Food J. 108 (2006) 54–60. | DOI

[30] A. A. Taleizadeh, D. W. Pentico, M. S. Jabalameli and M. Aryanezhad, An economic order quantity model with multiple partial prepayments and partial backordering. Math. Comput. Model. 57 (2013) 311–323. | MR | Zbl | DOI

[31] A. A. Taleizadeh, An economic order quantity model for deteriorating items in a purchasing system with multiple prepayments. Appl. Math. Model. 38 (2014) 5357–5366. | MR | DOI

[32] J. T. Teng, J. Min and Q. Pan, Economic order quantity model with trade credit financing for non-decreasing demand. Omega 40 (2012) 328–335. | DOI

[33] J. T. Teng, L. E. Cárdenas-Barrón, H. J. Chang, J. Wu and Y. Hu, Inventory lot-size policies for deteriorating items with expiration dates and advance payments. Appl. Math. Model. 40 (2016) 8605–8616. | MR | DOI

[34] A. Thangam and R. Uthayakumar, Two-echelon trade credit financing for perishable items in a supply chain when demand depends on both selling price and credit period. Comput. Ind. Eng. 57 (2009) 773–786. | DOI

[35] S. Tiwari, L. E. Cárdenas-Barrón, M. Goh and A. A. Shaikh, Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain. Int. J. Prod. Econ. 200 (2018) 16–36. | DOI

[36] Y.-C. Tsao, A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits. Ann. Oper. Res. 233 (2015) 465–481. | MR | DOI

[37] M.-F. Yang and W.-C. Tseng, Deteriorating inventory model for chilled food. Math. Prob. Eng. 2015 (2015) 1–10. | MR

[38] A. X. Zhang, Optimal advance payment scheme involving fixed per-payment costs. Omega 24 (1996) 577–582. | DOI

Cité par Sources :