The purpose of this paper is to propose mathematical models to represent a lot sizing and scheduling problem on multiple production lines that share scarce resources and to investigate the computational performance of the proposed models. The main feature that differentiates this problem from others in the literature is that the decision on which lines to organize should be taken considering the availability of the necessary resources. The optimization criterion is the minimization of the costs incurred in the production process (inventory, backlogging, organization of production lines, and sequence-dependent setup costs). Nine mixed integer optimization models to represent the problem are given and, also, the results of an extensive computational study carried out using a set of instances from the literature. The computational study indicates that an efficient formulation, able to provide high quality solutions for large sized instances, can be obtained from a classical model by making the binary production variables explicit, using the facility location reformulation as well as the single commodity flow constraints to eliminate subsequences. Moreover, from the results, it is also clear that the consideration of scarce resources makes the problem significantly more difficult than the traditional one.
Keywords: Lot sizing and scheduling, parallel production lines, scarce resources, mixed integer programming models
@article{RO_2021__55_3_1949_0,
author = {Alves de Oliveira Soler, Willy and Oliveira Santos, Maristela and Rangel, Socorro},
title = {Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources},
journal = {RAIRO. Operations Research},
pages = {1949--1970},
year = {2021},
publisher = {EDP-Sciences},
volume = {55},
number = {3},
doi = {10.1051/ro/2021084},
mrnumber = {4277917},
zbl = {1471.90097},
language = {en},
url = {https://www.numdam.org/articles/10.1051/ro/2021084/}
}
TY - JOUR AU - Alves de Oliveira Soler, Willy AU - Oliveira Santos, Maristela AU - Rangel, Socorro TI - Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources JO - RAIRO. Operations Research PY - 2021 SP - 1949 EP - 1970 VL - 55 IS - 3 PB - EDP-Sciences UR - https://www.numdam.org/articles/10.1051/ro/2021084/ DO - 10.1051/ro/2021084 LA - en ID - RO_2021__55_3_1949_0 ER -
%0 Journal Article %A Alves de Oliveira Soler, Willy %A Oliveira Santos, Maristela %A Rangel, Socorro %T Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources %J RAIRO. Operations Research %D 2021 %P 1949-1970 %V 55 %N 3 %I EDP-Sciences %U https://www.numdam.org/articles/10.1051/ro/2021084/ %R 10.1051/ro/2021084 %G en %F RO_2021__55_3_1949_0
Alves de Oliveira Soler, Willy; Oliveira Santos, Maristela; Rangel, Socorro. Optimization models for a lot sizing and scheduling problem on parallel production lines that share scarce resources. RAIRO. Operations Research, Tome 55 (2021) no. 3, pp. 1949-1970. doi: 10.1051/ro/2021084
[1] and , Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions. Comput. Ind. Eng. 98 (2016) 40–52. | DOI
[2] , , and , General lot-sizing and scheduling for perishable food products. RAIRO-Oper. Res. 54 (2020) 913–931. | MR | Zbl | Numdam | DOI
[3] , , , and , Industrial insights into lot sizing and scheduling modeling. Pesquisa Operacional 35 (2015) 439–46. | DOI
[4] and , Synchronisation of scarce resources for a parallel machine lotsizing problem. Int. J. Prod. Econ. 49 (2011) 7315–7335. | DOI
[5] and , Rolling-horizon lot-sizing when set-up times are sequence-dependent. Int. J. Prod. Econ. 38 (2000) 2287–2307. | Zbl | DOI
[6] , , and , Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spec. 39 (2017) 1–64. | MR | Zbl | DOI
[7] and , Benchmarking optimization software with performance profiles. Math. Program. 91 (2002) 201–213. | MR | Zbl | DOI
[8] and , Solving multi-item capacitated lot-sizing problems using variable redefinition. Oper. Res. 35 (1987) 832–848. | Zbl | DOI
[9] and , The general lotsizing and scheduling problem. Oper. Res. Spek. 19 (1997) 11–21. | MR | Zbl | DOI
[10] and , A survey of case studies in production scheduling: Analysis and perspectives. J. Comput. Sci. 25 (2018) 425–436. | DOI
[11] and , The travelling salesman problem and related problems (1978).
[12] , and , The lot sizing problem: A tertiary study. Int. J. Prod. Econ. 155 (2014) 39–51. | DOI
[13] , and , Modeling lotsizing and scheduling problems with sequence dependent setups. Eur. J. Oper. Res. 239 (2014) 644–662. | MR | Zbl | DOI
[14] , and , A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand. Int. J. Prod. Econ. 56 (2018) 3344–3357. | DOI
[15] , Capacitated lot-sizing with sequence dependent setup costs. Oper. Res. Spek. 18 (1996) 51–59. | MR | Zbl | DOI
[16] and , Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities. Int. J. Prod. Econ. 66 (2000) 159–169. | DOI
[17] and , Single and parallel machine capacitated lotsizing and scheduling: New iterative mip-based neighborhood search heuristics. Comput. Oper. Res. 38 (2011) 1816–1825. | Zbl | DOI
[18] , and , Production planning and scheduling of parallel continuous processes with product families. Ind. Eng. Chem. Res. 50 (2010) 1369–1378. | DOI
[19] , The traveling salesman problem: a guided tour of combinatorial optimization. Wiley-Interscience Series Discrete Mathematics (1985). | Zbl
[20] , Simultaneous lotsizing and scheduling by combining local search with dual reoptimization. Eur. J. Oper. Res. 120 (2000) 311–326. | MR | Zbl | DOI
[21] , Simultaneous lotsizing and scheduling on parallel machines. Eur. J. Oper. Res. 139 (2002) 277–292. | MR | Zbl | DOI
[22] , and , Integer programming formulation of traveling salesman problems. JACM 7 (1960) 326–329. | MR | Zbl | DOI
[23] and , A new branching rule to solve the capacitated lot sizing and scheduling problem with sequence dependent setups. TEMA (São Carlos) 18 (2017) 515–529. | MR | DOI
[24] , and , Mip approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products. J. Oper. Res. Soc. (2019) 1–16.
[25] , Mip modelling of changeovers in production planning and scheduling problems. Eur. J. Oper. Res. 99 (1997) 154–165. | Zbl | DOI
[26] , , , and , A hybrid lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times. Comput. Oper. Res. 63 (2015) 72–82. | MR | Zbl | DOI
Cité par Sources :





