Random machine breakdown and stochastic corrective maintenance period on an economic production inventory model with buffer machine and safe period
RAIRO. Operations Research, Tome 55 (2021), pp. S1129-S1149

In this paper, we have developed an economic production quantity (EPQ) model in which production is executed mainly by the original machine. But when the system faces disruption, the buffer of it continues the production. Here, we incorporate a fixed Safe Period running policy, in which the machine runs interruptedly, whenever production commences. The disruption of the system may occur at any moment of the time horizon over the safe period, and then, it will go under the corrective maintenance policy. Here, we take that both of the time of disruption and period of maintenance are continuous random variables. We have discussed the model under different safe period duration with corresponding disruption situations. Our main objective is to minimize the expected average total cost for all the cases concerning the production lot size. The model has also been illustrated numerically with some examples. To examine the robustness of the solution of this model, we discuss the sensitivity analysis for the parameters.

DOI : 10.1051/ro/2020069
Classification : 90B06
Keywords: Inventory, breakdown, maintenance, buffer machine, safe period
@article{RO_2021__55_S1_S1129_0,
     author = {Pal, Brojeswar and Adhikari, Subhankar},
     title = {Random machine breakdown and stochastic corrective maintenance period on an economic production inventory model with buffer machine and safe period},
     journal = {RAIRO. Operations Research},
     pages = {S1129--S1149},
     year = {2021},
     publisher = {EDP-Sciences},
     volume = {55},
     doi = {10.1051/ro/2020069},
     mrnumber = {4223162},
     zbl = {1469.90023},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2020069/}
}
TY  - JOUR
AU  - Pal, Brojeswar
AU  - Adhikari, Subhankar
TI  - Random machine breakdown and stochastic corrective maintenance period on an economic production inventory model with buffer machine and safe period
JO  - RAIRO. Operations Research
PY  - 2021
SP  - S1129
EP  - S1149
VL  - 55
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2020069/
DO  - 10.1051/ro/2020069
LA  - en
ID  - RO_2021__55_S1_S1129_0
ER  - 
%0 Journal Article
%A Pal, Brojeswar
%A Adhikari, Subhankar
%T Random machine breakdown and stochastic corrective maintenance period on an economic production inventory model with buffer machine and safe period
%J RAIRO. Operations Research
%D 2021
%P S1129-S1149
%V 55
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2020069/
%R 10.1051/ro/2020069
%G en
%F RO_2021__55_S1_S1129_0
Pal, Brojeswar; Adhikari, Subhankar. Random machine breakdown and stochastic corrective maintenance period on an economic production inventory model with buffer machine and safe period. RAIRO. Operations Research, Tome 55 (2021), pp. S1129-S1149. doi: 10.1051/ro/2020069

N. Bahria, A. Chelbi, H. Bouchriha and I. H. Dridi, Integrated production, statistical process control and maintenance policy for unreliable manufacturing system. Int. J. Prod. Res. 57 (2018) 2548–2570. | DOI

V. Boschian, N. Rezg and A. Chelbi, Contribution of simulation to the optimization of maintenance strategies for a randomly falling production system. Eur. J. Oper. Res. 197 (2009) 1142–1149. | MR | DOI

T. Chakraborty, B. C. Giri and K. S. Chaudhuri, Production lot sizing with process deterioration under inspection schedule. Omega 37 (2009) 257–271. | DOI

A. Chelbi and D. Ait-Kadi, Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. Eur. J. Oper. Res. 156 (2004) 712–718. | MR | Zbl | DOI

G. Q. Cheng, B. H. Zhou and L. Li, Joint optimization of production rate and preventive maintenance in machine systems. Int. J. Prod. Res. 54 (2016) 6378–6394. | DOI

S.-W. Chiu, Robust planning in optimization for production system subject to random machine breakdown and failure in rework. Comput. Oper. Res. 37 (2010) 899–908. | MR | Zbl | DOI

S.-W. Chiu, S.-W. Chen, Y.-S.-P. Chiu and T.-W. Li, Production-retailer integrated EMQ system with machine breakdown, rework failures and a discontinuous issuing policy. Springerplus 5 (2016) 339. | DOI

M. A. Darwish and M. Ben-Daya, Effect of inspection errors and preventive maintenance on a two-stage production system. Int. J. Prod. Econ. 107 (2007) 301–313. | DOI

M. C. Fitouhi and M. Nourelfath, Integrating noncyclical preventive maintenance scheduling and production planning for a single machine. Int. J. Prod. Econ. 136 (2012) 344–351. | DOI

B. C. Giri and T. Dohi, Optimal design of unreliable production-inventory systems with variable production rate. Eur. J. Oper. Res. 162 (2005) 372–386. | MR | Zbl | DOI

A. V. Horenbeek, J. B. D. Cattrysse, L. Pintelon and P. Vansteenwegen, Joint maintenance and inventory optimization system: a review. Int. J. Prod. Econ. 143 (2013) 499–508. | DOI

C. C. Karamatsoukis and E. G. Kyriakidis, Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer. Eur. J. Oper. Res. 207 (2010) 297–308. | MR | Zbl | DOI

J. P. Kenne, A. Gharbi and M. Beit, Age-dependent production planning and maintenance strategies in unreliable manufacturing system with lost sale. Eur. J. Oper. Res. 178 (2007) 408–420. | Zbl | DOI

T. Kim and C. H. Glock, Production planning for a two-stage production system with multiple parallel machines and variable production rates. Int. J. Prod. Econ. 196 (2018) 284–292. | DOI

H.-T. Luong and R. Karim, An integrated production inventory model of deteriorating items subject to random machine breakdown with stochastic repair time. Int. J. Ind. Eng. Comput. 8 (2017) 217–236.

M. Nourelfath, Service level robustness in stochastic production planning under random machine breakdowns. Eur. J. Oper. Res. 212 (2011) 81–88. | MR | Zbl | DOI

B. Pal, S. S. Sana and K. S. Chaudhuri, A multi-echelon production-inventory system with supply disruption. J. Manuf. Syst. 33 (2014) 262–276. | DOI

M. Peymankar, F. Dehghanian, Y. Ghiami and H. Abolbashari, The effects of contractual agreements on the economic production quantity model with machine breakdown. Int. J. Prod. Econ. 201 (2018) 203–215. | DOI

H. Rafiei, M. Rabbani, H. Vafa-Arani and G. Bodaghi, Production inventory analysis of single-station parallel machine make-to-stock/make-to-order system with random demands and lead times. Int. J. Manage. Sci. and Eng. Manage. 12 (2017), 33–44.

S. S. Sana, Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int. J. Prod. Res. 50 (2012) 6763–6774. | DOI

X. Shi, H. Shen, T. Wu and T. C. E. Cheng, Production planning and pricing policy in amake-to-stock system with uncertain demand subject to machine breakdown. Eur. J. Oper. Res. 238 (2014) 122–129. | MR | Zbl | DOI

A. A. Taleizadeh, L. E. Cárdenas-Barrón and B. Mohammadi, A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. Int. J. Prod. Econ. 150 (2014) 9–27. | DOI

A. A. Taleizadeh, H. Samimi, B. Sarkar and B. Mohammadi, Stochastic machine breakdown and discrete delivery in an imperfect inventory production system. J. Ind. Manage. Optim. 13 (2017) 1511–1535. | DOI

H. M. Wee and G. A. Widyadana, Single vendor single buyer inventory model with discrete delivery order, random machine availability time and lost sales. Int. J. Prod. Econ. 143 (2013) 574–579. | DOI

Cité par Sources :