An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management
RAIRO. Operations Research, Tome 55 (2021) no. 1, pp. 189-211

This paper presents an integrated imperfect production inventory model under two layer supply chain management. To ensure the orders, manufacturer convinces the retailer to pay a percentage of the purchasing cost prior to replenish the products and offers the facilities such as (i) delay in payment on the remaining part of the purchasing cost and (ii) free transportation on the basis of advance payment amount. Time dependent development cost is incurred to maintain the reliability of the production system and as a result it reduces the imperfectness of the product during production. Under such circumstances, an integrated profit function has been developed to find the optimum number of production cycle, optimum number of replenishment cycle and hence reliability parameter of the manufacturing system, replenishment quantity for the retailer which maximize the integrated profit. Branch and Bound technique is used to obtain the integer solutions. Furthermore, we derived some useful lemmas and algorithms to obtain the optimum solution. Finally, the model has been illustrated with some numerical examples exploring the sensitivity analysis with respect to some parameters and obtains some managerial insights.

Reçu le :
Accepté le :
Première publication :
Publié le :
DOI : 10.1051/ro/2020137
Classification : 90B05, 90B30, 90B25, 90B50
Keywords: Imperfect production, advance payment, replenishment cycle time, system reliability, credit period, branch and bound technique
@article{RO_2021__55_1_189_0,
     author = {Khara, Barun and Mondal, Shyamal Kumar and Dey, Jayanta Kumar},
     title = {An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management},
     journal = {RAIRO. Operations Research},
     pages = {189--211},
     year = {2021},
     publisher = {EDP-Sciences},
     volume = {55},
     number = {1},
     doi = {10.1051/ro/2020137},
     mrnumber = {4228689},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2020137/}
}
TY  - JOUR
AU  - Khara, Barun
AU  - Mondal, Shyamal Kumar
AU  - Dey, Jayanta Kumar
TI  - An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management
JO  - RAIRO. Operations Research
PY  - 2021
SP  - 189
EP  - 211
VL  - 55
IS  - 1
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2020137/
DO  - 10.1051/ro/2020137
LA  - en
ID  - RO_2021__55_1_189_0
ER  - 
%0 Journal Article
%A Khara, Barun
%A Mondal, Shyamal Kumar
%A Dey, Jayanta Kumar
%T An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management
%J RAIRO. Operations Research
%D 2021
%P 189-211
%V 55
%N 1
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2020137/
%R 10.1051/ro/2020137
%G en
%F RO_2021__55_1_189_0
Khara, Barun; Mondal, Shyamal Kumar; Dey, Jayanta Kumar. An imperfect production inventory model with advance payment and credit period in a two-echelon supply chain management. RAIRO. Operations Research, Tome 55 (2021) no. 1, pp. 189-211. doi: 10.1051/ro/2020137

[1] V. Agarwal, X. Chao and S. Seshadri, Dynamic balancing of inventory in supply chains. Eur. J. Oper. Res. 159 (2004) 296–317. | MR | Zbl | DOI

[2] A. Banerjee, A joint echonomic lot-size-model for purchaser and vendor. Decis. Sci. 17 (2007) 292–311. | DOI

[3] A. Banu and S. K. Mondal, Analysis of credit linked demand in an inventory model with varying ordering cost. SpringerPlus. 5 (2016) 926. | DOI

[4] M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. | Zbl | DOI

[5] G. P. Cachon and P. H. Zipkin, Competitive and cooperative inventory policies in a two-stage supply chain. Manage. Sci. 45 (1999) 936–953. | Zbl | DOI

[6] B. C. Das, B. Das and S. K. Mondal, An integrated supply chain for a deteriorating item with procurement cost dependent credit period. Comput. Ind. Eng. 64 (2013) 788–796. | DOI

[7] B. C. Das, B. Das and S. K. Mondal, An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets. Appl. Soft Comput. 28 (2015) 453–465. | DOI

[8] B. C. Das, B. Das and S. K. Mondal, An integrated production-inventory model with defective item dependent stochastic credit period. Comput. Ind. Eng. 110 (2017) 255–263. | DOI

[9] S. K. De and G. C. Mahata, A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach. Soft Comput. 24 (2020) 5053–5069. | DOI

[10] S. K. De and G. C. Mahata, An EPQ model for three-layer supply chain with partial backordering and disruption: triangular dense fuzzy lock set approach. Sadhana 44 (2019) 177. | MR | DOI

[11] S. K. De and G. C. Mahata, A cloudy fuzzy economic order quantity model for imperfect-quality items with allowable proportionate discounts. J. Ind. Eng. Int. 15 (2019) 571–583. | DOI

[12] S. K. De and G. C. Mahata, A comprehensive study of an economic order quantity model under fuzzy monsoon demand. Sadhana, Indian Acad. Sci. 44 (2019) 89. | MR

[13] S. K. De and S. S. Sana, Two-layer supply chain model for cauchy type stochastic demand under fuzzy environment. Int. J. Intell. Comput. Cybern. 11 (2018) 285–308. | DOI

[14] S. K. Goyal, Economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. 36 (1985) 335–338. | Zbl | DOI

[15] S. K. Goyal, A joint echonomic-lot-size model for purchaser and vendor: a comment. Decis. Sci. 19 (1988) 236–241. | DOI

[16] R. K. Gupta, A. K. Bhunia and S. K. Goyal, An application of Genetic Algorithm in solving an inventory model with advance payment and interval valued inventory costs. Math. Comput. Modell. 49 (2009) 893–905. | MR | Zbl | DOI

[17] M. A. Khan, A. A. Shaikh, G. C. Panda and I. Konstantaras, Two-warehouse inventory model for deteriorating items with partial backlogging and advance payment scheme. RAIRO:OR 53 (2019) 1691–1708. | MR | Numdam | DOI

[18] M. A. Khan, A. A. Shaikh, G. C. Panda, I. Konstantaras and L. E. Cárdenas-Barrón, The effect of advance payment with discount facility on supply decisions of deteriorating products whose demand is both price and stock dependent. Int. Trans. Oper. Res. 27 (2020) 1343–1367. | MR | DOI

[19] B. Khara, J. K. Dey and S. K. Mondal, An inventory model under development cost dependent imperfect production and reliability dependent demand. J. Manage. Anal. 4 (2017) 258–275.

[20] B. Khara, J. K. Dey and S. K. Mondal, Sustainable recycling in an imperfect production system with acceptance quality level dependent development cost and demand. Comput. Ind. Eng. 142 (2020). | DOI

[21] B. Khara, J. K. Dey and S. K. Mondal, An integrated imperfect production system with advertisement dependent demand using branch and bound technique. To appear in: Flexible Serv. Manuf. J. (2020). DOI: 10.1007/s10696-020-09377-5.

[22] M. Khouja and A. Mehrez, An economic production lot size model with imperfect quality and variable production rate. J. Oper. Res. Soc. 45 (1994) 1405–1417. | Zbl | DOI

[23] M. Lashgari, A. A. Taleizadeh and A. Ahmadi, Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain. Ann. Oper. Res. 238 (2016) 329–354. | MR | DOI

[24] M. Lashgari, A. A. Taleizadeh and S. J. Sadjadi, Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering. J. Oper. Res. Soc. 69 (2018) 1167–1196. | DOI

[25] R. Li, Y. L. Chan, C. T. Chang and L. E. Cárdenas-Barrón, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. | DOI

[26] Y. Liang and F. Zhou, A two-warehouse inventory model for deteriorating items under conditionally permissible delay in payment. Appl. Math. Modell. 35 (2011) 2221–2231. | MR | Zbl | DOI

[27] S. Ma, J. Lin, W. Xing and X. Zhao, Advance booking discount in the presence of spot market. Int. J. Prod. Res. 53 (2015) 2921–2936. | DOI

[28] S. Maity, A. Chakraborty, S. K. De, S. P. Mondal and S. Alam, A comprehensive study of a backlogging EOQ model with nonlinear heptagonal dense fuzzy environment. RAIRO:OR 54 (2020) 267–286. | MR | Numdam | DOI

[29] A. K. Manna, J. K. Dey and S. K. Mondal, Three-layer supply chain in an imperfect production inventory model with two storage facilities under fuzzy rough environment. J. Uncertainty Anal. App. 2 (2014) 17. | DOI

[30] A. K. Manna, B. Das, J. K. Dey and S. K. Mondal, Multi-item EPQ model with learning effect on imperfect production over fuzzy-random planning horizon. J. Manage. Anal. 4 (2016) 80–110.

[31] A. K. Manna, J. K. Dey and S. K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. | DOI

[32] M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. | DOI

[33] M. Salameh and M. Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. | DOI

[34] S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain. Decis. Support Syst. 50 (2011) 539–547. | DOI

[35] A. A. Shaikh, S. C. Das, A. K. Bhunia, G. C. Panda and M. A. Khan, A two-warehouse EOQ model with interval-valued inventory cost and advance payment for deteriorating item under particle swarm optimization. Soft Comput. 23 (2019) 13531–13546. | DOI

[36] Y. Shi, Z. Zhang, S. C. Chen, L. E. Cárdenas-Barrón and K. Skouri, Optimal replenishment decisions for perishable products under cash, advance, and credit payments considering carbon tax regulations. Int. J. Prod. Econ. 223 (2020).

[37] A. A. Taleizadeh, An EOQ model with partial backordering and advance payments for an evaporating item. Int. J. Prod. Econ. 155 (2014) 185–193. | DOI

[38] A. A. Taleizadeh, Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering. Int. Trans. Oper. Res. 24 (2017) 783–800. | MR | DOI

[39] A. A. Taleizadeh, D. W. Pentico, M. S. Jabalameli and M. Aryanezhad, An economic order quantity model with multiple partial prepayments and partial backordering. Math. Comput. Modell. 57 (2013) 311–323. | MR | Zbl | DOI

[40] S. Tavakoli and A. A. Taleizadeh, An EOQ model for decaying item with full advanced payment and conditional discount. Ann. Oper. Res. 259 (2017) 415–436. | MR | DOI

[41] A. Thangam, Optimal price discounting and lot-sizing policies for perishable items in a supply chain under advance payment scheme and two-echelon trade credits. Int. J. Prod. Econ. 139 (2012) 459–472. | DOI

[42] Q. H. Zhang, Y. C. Tsao and T. H. Chen, Economic order quantity under advance payment. Appl. Math. Modell. 38 (2014) 5910–5921. | MR | DOI

[43] Q. Zhang, D. Zhang, Y. C. Tsao and J. Luo, Optimal ordering policy in a two-stage supply chain with advance payment for stable supply capacity. Int. J. Prod. Econ. 177 (2016) 34–43. | DOI

[44] N. P. Zia and A. A. Taleizadeh, A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment. Transp. Res. Part E 82 (2015) 19–37. | DOI

Cité par Sources :