This note is concerned with the bicriteria scheduling problem on a series-batching machine to minimize maximum cost and makespan. An O(n5) algorithm has been established previously. Here is an improved algorithm which solves the problem in O(n3) time.
Keywords: multicriteria scheduling, batching machine, maximum cost, pareto optimal solutions
@article{RO_2013__47_1_1_0,
author = {He, Cheng and Wang, Xiumei and Lin, Yixun and Mu, Yundong},
title = {An {Improved} {Algorithm} for a {Bicriteria} {Batching} {Scheduling} {Problem}},
journal = {RAIRO - Operations Research - Recherche Op\'erationnelle},
pages = {1--8},
year = {2013},
publisher = {EDP Sciences},
volume = {47},
number = {1},
doi = {10.1051/ro/2012023},
mrnumber = {3031096},
zbl = {1271.90033},
language = {en},
url = {https://www.numdam.org/articles/10.1051/ro/2012023/}
}
TY - JOUR AU - He, Cheng AU - Wang, Xiumei AU - Lin, Yixun AU - Mu, Yundong TI - An Improved Algorithm for a Bicriteria Batching Scheduling Problem JO - RAIRO - Operations Research - Recherche Opérationnelle PY - 2013 SP - 1 EP - 8 VL - 47 IS - 1 PB - EDP Sciences UR - https://www.numdam.org/articles/10.1051/ro/2012023/ DO - 10.1051/ro/2012023 LA - en ID - RO_2013__47_1_1_0 ER -
%0 Journal Article %A He, Cheng %A Wang, Xiumei %A Lin, Yixun %A Mu, Yundong %T An Improved Algorithm for a Bicriteria Batching Scheduling Problem %J RAIRO - Operations Research - Recherche Opérationnelle %D 2013 %P 1-8 %V 47 %N 1 %I EDP Sciences %U https://www.numdam.org/articles/10.1051/ro/2012023/ %R 10.1051/ro/2012023 %G en %F RO_2013__47_1_1_0
He, Cheng; Wang, Xiumei; Lin, Yixun; Mu, Yundong. An Improved Algorithm for a Bicriteria Batching Scheduling Problem. RAIRO - Operations Research - Recherche Opérationnelle, Tome 47 (2013) no. 1, pp. 1-8. doi: 10.1051/ro/2012023
[1] and , The complexity of one-machine batching problems. Discrete Appl. Math. 47 (1993) 87-107. | Zbl | MR
[2] , Scheduling Algorithms (third edition). Springer, Berlin (2001). | Zbl | MR
[3] , , and , Optimization and approximation in deterministic sequencing and scheduling : A survey. Annal. Discr. Math. 5 (1979) 287-326. | Zbl | MR
[4] , , and , Bicriteria scheduling on a series -batching machine to minimize maximum cost and makespan. CEJOR Cent. Eur. J. Oper. Res. 21 (2013) 177-186. | MR
[5] , and , Bicriteria scheduling of minimizing maximum lateness and makespan on a serial-batching machine. Found. Comput. Decision Sci. 33 (2008) 369-376. | Zbl | MR
[6] , and , A DP algorighm for minimizing makespan and total completion time on a series-batching machine. Informat. Process. Lett. 109 (2009) 603-607. | Zbl | MR
[7] , Multicriteria scheduling. European J. Oper. Res. 167 (2005) 592-623. | Zbl | MR
[8] , Single-machine scheduling to minimize a function of two or three maximum cost criteria. J. Algorithms 21 (1996) 415-433. | Zbl | MR
[9] and , Scheduling groups of jobs on a single machine. Oper. Res. 43 (1995) 692-703. | Zbl | MR
Cité par Sources :





