Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives
RAIRO. Operations Research, Tome 56 (2022) no. 1, pp. 183-197

Every industrial sector emits carbon emissions during production, which is always a major concern for environmental practitioners. To resolve this, innovative and smart ways are required that are not only cost-effective but also environmentally savvy. Moreover, the production processes are also prone to various imperfections, and thus the production of defectives is quite pragmatic. The handling of such defective products varies from industry to industry and type of products. The present study constructs an inventory model to handle the defective products via a proficient rework strategy that makes the product fit to be sold at the primary price. Here, the demand for the product is assumed to be dependent on the selling price and advertisements. The model also considers the energy usage during the production and the cost of carbon emissions while optimizing the production batch size and selling price. Optimality is proved graphically by using the software Mathematica 11.3.0. A comprehensive sensitivity analysis for all the parameters is performed to impart managerial insights and robustness to the model.

Reçu le :
Accepté le :
Première publication :
Publié le :
DOI : 10.1051/ro/2021188
Classification : 90B05, 90B30
Keywords: Inventory, production, energy, pricing, optimization
@article{RO_2022__56_1_183_0,
     author = {Gautam, Prerna and Maheshwari, Sumit and Hasan, Ahmad and Kausar, Amrina and Jaggi, Chandra K.},
     title = {Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives},
     journal = {RAIRO. Operations Research},
     pages = {183--197},
     year = {2022},
     publisher = {EDP-Sciences},
     volume = {56},
     number = {1},
     doi = {10.1051/ro/2021188},
     mrnumber = {4376291},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2021188/}
}
TY  - JOUR
AU  - Gautam, Prerna
AU  - Maheshwari, Sumit
AU  - Hasan, Ahmad
AU  - Kausar, Amrina
AU  - Jaggi, Chandra K.
TI  - Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives
JO  - RAIRO. Operations Research
PY  - 2022
SP  - 183
EP  - 197
VL  - 56
IS  - 1
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2021188/
DO  - 10.1051/ro/2021188
LA  - en
ID  - RO_2022__56_1_183_0
ER  - 
%0 Journal Article
%A Gautam, Prerna
%A Maheshwari, Sumit
%A Hasan, Ahmad
%A Kausar, Amrina
%A Jaggi, Chandra K.
%T Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives
%J RAIRO. Operations Research
%D 2022
%P 183-197
%V 56
%N 1
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2021188/
%R 10.1051/ro/2021188
%G en
%F RO_2022__56_1_183_0
Gautam, Prerna; Maheshwari, Sumit; Hasan, Ahmad; Kausar, Amrina; Jaggi, Chandra K. Optimal inventory strategies for an imperfect production system with advertisement and price reliant demand under rework option for defectives. RAIRO. Operations Research, Tome 56 (2022) no. 1, pp. 183-197. doi: 10.1051/ro/2021188

M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. | Zbl | DOI

A. K. Bhunia and M. Maiti, An inventory model for decaying items with selling price, frequency of advertisement and linearly time-dependent demand with shortages. IAPQR Trans. 22 (1997) 41–50. | Zbl

K. Biel and C. H. Glock, Systematic literature review of decision support models for energy-efficient production planning. Comput. Ind. Eng. 101 (2016) 243–259. | DOI

K. Bunse, M. Vodicka, P. Schönsleben, M. Brülhart and F. O. Ernst, Integrating energy efficiency performance in production management–gap analysis between industrial needs and scientific literature. J. Clean. Prod. 19 (2011) 667–679. | DOI

L. E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57 (2009) 1105–1113. | DOI

Y. P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 35 (2003) 427–437. | DOI

S. W. Chiu, D. C. Gong and H. M. Wee, Effects of random defective rate and imperfect rework process on economic production quantity model. Jpn. J. Ind. Appl. Math. 21 (2004) 375. | MR | Zbl | DOI

R. R. Choudhury, S. K. Ghosh and K. S. Chaudhuri, The effect of imperfect production in an economic production lot size model. Int. J. Manag. Sci. Eng. Manag. 10 (2015) 288–296.

K. J. Chung and K. L. Hou, An optimal production run time with imperfect production processes and allowable shortages. Comput. Oper. Res. 30 (2003) 483–490. | Zbl | DOI

S. Dari and B. Sani, An EPQ model for delayed deteriorating items with quadratic demand and linear holding cost. Opsearch 57 (2020) 46–72. | MR | DOI

B. K. Dey, B. Sarkar, M. Sarkar and S. Pareek, An integrated inventory model involving discrete setup cost reduction, variable safety factor, selling price dependent demand, and investment. RAIRO-Oper. Res. 53 (2019) 39–57. | MR | Numdam | Zbl | DOI

B. K. Dey, S. Bhuniya and B. Sarkar, Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management. Expert Syst. Appl. 184 (2021) 115464. | DOI

C. G. De-La-Cruz-Márquez, L. E. Cárdenas-Barrón and B. Mandal, An inventory model for growing items with imperfect quality when the demand is price sensitive under carbon emissions and shortages. Math. Probl. Eng. (2021) 1–23. | MR | DOI

A. Eroglu and G. Ozdemir, An economic order quantity model with defective items and shortages. Int. J. Prod. Econ. 106 (2007) 544–549. | DOI

P. Gautam, A. Kishore, A. Khanna and C. K. Jaggi, Strategic defect management for a sustainable green supply chain. J. Clean. Prod. 233 (2019) 226–241. | DOI

P. Gautam, A. Khanna and C. K. Jaggi, Preservation technology investment for an inventory system with variable deterioration rate under expiration dates and price sensitive demand. Yugosl. J. Oper. Res. 30 (2020) 289–305. | DOI

P. Gautam, S. Maheshwari, A. Kausar and C. K. Jaggi, Inventory models for imperfect quality items: a two-decade review. Adv. Interdiscip. Res. Eng. Business Manag. (2021) 185–215. | DOI

C. H. Glock and M. Y. Jaber, Learning effects and the phenomenon of moving bottlenecks in a two-stage production system. Appl. Math. Model. 37 (2013) 8617–8628. | MR | DOI

C. H. Glock, M. Y. Jaber and C. Searcy, Sustainability strategies in an EPQ model with price- and quality- sensitive demand. Int. J. Logist. Manag. 23 (2012) 340–359. | DOI

S. K. Goyal and A. Gunasekaran, An integrated production-inventory-marketing model for deteriorating items. Comput. Ind. Eng. 28 (1995) 755–762. | DOI

R. Guchhait, B. K. Dey, S. Bhuniya, B. Ganguly, B. Mandal, R. K. Bachar, B. Sarkar, H. M. Wee and K. Chaudhuri, Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages. RAIRO-Oper. Res. 54 (2020) 251–266. | MR | Numdam | DOI

F. W. Harris, How many parts to make at once. Fact. Mag. Manag. 10 (1913) 135–136.

P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control. 12 (2001) 584–590. | DOI

H. W. Jeon, M. Taisch and V. V. Prabhu, Modelling and analysis of energy footprint of manufacturing systems. Int. J. Prod. Res. 53 (2015) 7049–7059. | DOI

C. W. Kang, M. Ullah, B. Sarkar, I. Hussain and R. Akhtar, Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system. Int. J. Prod. Res. 55 (2017) 1748–1766. | DOI

A. Khanna, A. Kishore and C. K. Jaggi, Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit. Int. J. Ind. Eng. Comput. 8 (2017) 85–118.

A. Khanna, P. Gautam, A. Hasan and C. K. Jaggi, Inventory and pricing decisions for an imperfect production system with quality inspection, rework and carbon-emissions. Yugosl. J. Oper. Res. 30 (2020) 339–360. | MR | DOI

A. Khanna, P. Gautam, B. Sarkar and C. K. Jaggi, Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO-Oper. Res. 54 (2020) 435–450. | MR | Numdam | DOI

U. K. Khedlekar and R. K. Tiwari, Imperfect production model for sensitive demand with shortage. Reliab. Theory Appl. 13 (2018) 43–54.

A. Kishore, P. Gautam, A. Khanna and C. K. Jaggi, Investigating the effect of learning on setup cost in imperfect production systems using two-way inspection plan for rework under screening constraints. Sci. Iran. 27 (2020) 3265–3288.

P. Kotler, Marketing decision making: a model building approach, Holt, Rinehart, and Winston (1972) 23–37.

S. Ladany and A. Sternlieb, The interaction of economic ordering quantities and marketing policies. AIIE Trans. 6 (1974) 35–40. | DOI

H. L. Lee, Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Manage. Sci. 38 (1992) 1314–1328. | Zbl | DOI

H. H. Lee, M. J. Chandra and V. J. Deleveaux, Optimal batch size and investment in multistage production systems with scrap. Prod. Plan. Control. 8 (1997) 586–596. | DOI

W. Luo, An integrated inventory system for perishable goods with backordering. Comput. Ind. Eng. 34 (1998) 685–693. | DOI

A. K. Manna, B. Das and S. Tiwari, Impact of carbon emission on imperfect production inventory system with advance payment base free transportation. RAIRO-Oper. Res. 54 (2020) 1103–1117. | MR | Numdam | DOI

B. Marchi, S. Zanoni, I. Ferretti and L. E. Zavanella, Stimulating investments in energy efficiency through supply chain integration. Energies 11 (2018) 858. | DOI

B. Marchi, S. Zanoni and M. Y. Jaber, Economic production quantity model with learning in production, quality, reliability and energy efficiency. Comput. Ind. Eng. 129 (2019) 502–511. | DOI

U. Mishra, J. Z. Wu and B. Sarkar, Optimum sustainable inventory management with backorder and deterioration under controllable carbon emissions. J. Clean. Prod. 279 (2021) 123699. | DOI

N. M. Modak, D. K. Ghosh, S. Panda and S. S. Sana, Managing green house gas emission cost and pricing policies in a two-echelon supply chain. CIRP J. Manuf. Sci. Technol. 20 (2018) 1–11. | DOI

B. Mondal, A. K. Bhunia and M. Maiti, Inventory models for defective items incorporating marketing decisions with variable production cost. Appl. Math. Model. 33 (2009) 2845–2852. | MR | Zbl | DOI

L. Moussawi-Haidar, M. Salameh and W. Nasr, Production lot sizing with quality screening and rework. Appl. Math. Model. 40 (2016) 3242–3256. | MR | DOI

G. Mouzon, M. B. Yildirim and J. Twomey, Operational methods for minimization of energy consumption of manufacturing equipment. Int. J. Prod. Res. 45 (2007) 4247–4271. | Zbl | DOI

E. L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. | Zbl | DOI

A. K. Purohit, R. Shankar, P. K. Dey and A. Choudhary, Non-stationary stochastic inventory lot-sizing with emission and service level constraints in a carbon cap-and-trade system. J. Clean. Prod. 113 (2016) 654–661. | DOI

M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. | DOI

C. Rout, R. S. Kumar, D. Chakraborty and A. Goswami, An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages: a type-2 fuzzy approach. Opsearch 56 (2019) 657–688. | MR | DOI

C. Rout, A. Paul, R. S. Kumar, D. Chakraborty and A. Goswami, Cooperative sustainable supply chain for deteriorating item and imperfect production under different carbon emission regulations. J. Clean. Prod. 272 (2020) 122170. | DOI

S. Ruidas, M. R. Seikh and P. K. Nayak, An EPQ model with stock and selling price dependent demand and variable production rate in interval environment. Int. J. Syst. Assur. Eng. Manag. 11 (2020) 385–399. | DOI

S. Ruidas, M. R. Seikh and P. K. Nayak, A production inventory model with interval-valued carbon emission parameters under price-sensitive demand. Comput. Ind. Eng. 154 (2021) 107154. | DOI

M. K. Salameh and M. Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. | DOI

S. S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. | Zbl | DOI

N. H. Shah, D. G. Patel and D. B. Shah, EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand. Oper. Res. 18 (2018) 343–359.

E.-S. Subramanyam and S. Kumaraswamy, EOQ formula under varying marketing policies and conditions. AIIE Trans. 13 (1981) 312–314. | DOI

E. W. Taft, The most economical production lot. Iron Age 101 (1918) 1410–1412.

A. H. Tai, Economic production quantity models for deteriorating/imperfect products and service with rework. Comput. Ind. Eng. 66 (2013) 879–888. | DOI

J. Tang, S. Ji and L. Jiang, The design of a sustainable location-routing-inventory model considering consumer environmental behavior. Sustainability 8 (2016) 211. | DOI

G. K. Tayi and D. P. Ballou, An integrated production-inventory model with reprocessing and inspection. Int. J. Prod. Res. 26 (1988) 1299–1315. | DOI

S. Tiwari, Y. Daryanto and H. M. Wee, Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. J. Clean. Prod. 192 (2018) 281–292. | DOI

T. L. Urban, Deterministic inventory models incorporating marketing decisions. Comput. Ind. Eng. 22 (1992) 85–93. | DOI

J. Xu, Y. Chen and Q. Bai, A two-echelon sustainable supply chain coordination under cap-and-trade regulation. J. Clean. Prod. 135 (2016) 42–56. | DOI

L. Zhu, J. Zhou, Y. Yu and J. Zhu, Emission-Dependent Production for Environment-Aware Demand in Cap-and-Trade System. J. Adv. Manuf. Syst. 16 (2017) 67–80. | DOI

Cité par Sources :