Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation
RAIRO. Operations Research, Tome 55 (2021) no. 2, pp. 1063-1076

In this paper, a supply chain model between a manufacturing firm and a group of retailers has been developed. Manufacturing firm produces simultaneously both perfect and imperfect items which are separated by screening process. Then the perfect items are transferred to the retailers’ showroom/warehouse located in different places and a part of imperfect items are repaired by rework process. Retailers receive the products from the manufacturer with paying partial pre-payment to ensure the replenishment of order. On the other hand, the manufacturer provides partial free transportation facility to the retailers due to pre-payment. The corresponding problem has been formulated mathematically as a profit maximization problem and then solved it analytically. As an illustration of this supply chain model, three numerical examples have been considered and solved. Finally, post optimality analyses have been carried out to investigate the effects of changes of different parameters on the optimal policy.

DOI : 10.1051/ro/2021053
Keywords: Supply chain system, imperfect production, rework, pre-payment policy, transportation
@article{RO_2021__55_2_1063_0,
     author = {Manna, Amalesh Kumar and Mondal, Rajan and Akbar Shaikh, Ali and Ali, Irfan and Bhunia, Asoke Kumar},
     title = {Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation},
     journal = {RAIRO. Operations Research},
     pages = {1063--1076},
     year = {2021},
     publisher = {EDP-Sciences},
     volume = {55},
     number = {2},
     doi = {10.1051/ro/2021053},
     mrnumber = {4253782},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2021053/}
}
TY  - JOUR
AU  - Manna, Amalesh Kumar
AU  - Mondal, Rajan
AU  - Akbar Shaikh, Ali
AU  - Ali, Irfan
AU  - Bhunia, Asoke Kumar
TI  - Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation
JO  - RAIRO. Operations Research
PY  - 2021
SP  - 1063
EP  - 1076
VL  - 55
IS  - 2
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2021053/
DO  - 10.1051/ro/2021053
LA  - en
ID  - RO_2021__55_2_1063_0
ER  - 
%0 Journal Article
%A Manna, Amalesh Kumar
%A Mondal, Rajan
%A Akbar Shaikh, Ali
%A Ali, Irfan
%A Bhunia, Asoke Kumar
%T Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation
%J RAIRO. Operations Research
%D 2021
%P 1063-1076
%V 55
%N 2
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2021053/
%R 10.1051/ro/2021053
%G en
%F RO_2021__55_2_1063_0
Manna, Amalesh Kumar; Mondal, Rajan; Akbar Shaikh, Ali; Ali, Irfan; Bhunia, Asoke Kumar. Single-manufacturer and multi-retailer supply chain model with pre-payment based partial free transportation. RAIRO. Operations Research, Tome 55 (2021) no. 2, pp. 1063-1076. doi: 10.1051/ro/2021053

[1] H. K. Alfares and A. M. Ghaithan, EOQ and EPQ production-inventory models with variable holding cost: state-of-the-art review. Arab. J. Sci. Eng. 44 (2019) 1737–1755. | DOI

[2] M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. | Zbl | DOI

[3] A. K. Bhunia and A. A. Shaikh, A deterministic model for deteriorating items with displayed inventory level dependent demand rate incorporating marketing decisions with transportation cost. Int. J. Ind. Eng. Comput. 2 (2011) 547–562.

[4] A. K. Bhunia and A. A. Shaikh, A deterministic inventory model for deteriorating items with selling price dependent demand and three-parameter Weibull distributed deterioration. Int. J. Ind. Eng. Comput. 5 (2014) 497–510.

[5] A. K. Bhunia and A. A. Shaikh, An application of PSO in a two-warehouse inventory model for deteriorating item under permissible delay in payment with different inventory policies. Appl. Math. Comput. 256 (2015) 831–850. | MR

[6] A. K. Bhunia, A. A. Shaikh and L. E. Cárdenas-Barrón, A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability. Appl. Soft Comput. 55 (2017) 491–502. | DOI

[7] L. E. Cárdenas-Barrón, On optimal batch sizing in a multistage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. | MR | Zbl | DOI

[8] K.-J. Chung, The integrated inventory model with the transportation cost and two-level trade credit in supply chain management. Comput. Math. Appl. 64 (2012) 2011–2033. | MR | Zbl | DOI

[9] B. C. Das, B. Das and S. K. Mondal, Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period. Transp. Res. E Logist. Transp. Rev. 68 (2014) 1–13. | DOI

[10] A. Diabat, A. A. Taleizadeh and M. Lashgari, A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial back ordering for deteriorating items. J. Manuf. Syst. 45 (2017) 322–342. | DOI

[11] S. K. Goyal and L. E. Cárdenas-Barrón, Economic production quantity with imperfect production system. Ind. Eng. J. 34 (2005) 33–36.

[12] P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12 (2001) 584–590. | DOI

[13] C. Howard and J. Marklund, Evaluation of stock allocation policies in a divergent inventory system with shipment consolidation. Eur. J. Oper. Res. 211 (2011) 298–309. | MR | Zbl | DOI

[14] S. Jain, S. Tiwari, L. E. Cárdenas-Barrón, A. A. Shaikh and S. R. Singh, A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO:OR 52 (2018) 217–239. | MR | Zbl | Numdam | DOI

[15] M. A. A. Khan, A. A. Shaikh, G. C. Panda and I. Konstantaras, Two-warehouse inventory model for deteriorating items with partial backlogging and advance payment scheme. RAIRO:OR 53 (2018) 1691–1708. | MR | Zbl | Numdam | DOI

[16] C. Krishnamoorthi and S. Panayappan, An EPQ model for an imperfect production system with rework and shortages. Int. J. Oper. Res. 17 (2013) 104–124. | MR | DOI

[17] R. Levi, R. Roundy, D. Shmoys and M. Sviridenko, A constant approximation algorithm for the one-warehouse multi-retailer problem. Manage. Sci. 54 (2008) 763–776. | Zbl | DOI

[18] R. Li, Y.-L. Chan, C.-T. Chang and L. E. Cárdenas-Barrón, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. | DOI

[19] C.-S. Lin, C.-H. Chen and D. E. Kroll, Integrated production-inventory models for imperfect production processes under inspection schedules. Comput. Ind. Eng. 44 (2003) 633–650. | DOI

[20] R. Mallick, A. K. Manna and S. K. Mondal, A supply chain model for imperfect production system with stochastic lead time demand. J. Manage. Anal. 5 (2018) 309–333.

[21] A. K. Manna, J. K. Dey and S. K. Mondal, Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci. Oper. Logist. 6 (2018) 368–393.

[22] A. K. Manna, J. K. Dey and S. K. Mondal, Effect of inspection errors on imperfect production inventory model with warranty and price discount dependent demand rate. RAIRO:OR 54 (2020) 1189–1213. | MR | Numdam | DOI

[23] A. H. Nobil, A. H. A. Sedigh and L. E. Cárdenas-Barrón, A generalized economic order quantity inventory model with shortage: case study of a poultry farmer. Arab. J. Sci. Eng. 44 (2018) 2653–2663. | DOI

[24] L.-Y. Ouyang and C.-T. Chang, Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. Int. J. Prod. Econ. 144 (2013) 610–617. | DOI

[25] S. Pal and G. S. Mahapatra, A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Comput. Ind. Eng. 106 (2017) 299–314. | DOI

[26] M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production process. IIE Trans. 18 (1986) 48–55. | DOI

[27] M. K. Salameh and M. Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2010) 59–64. | DOI

[28] S. S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. | Zbl | DOI

[29] S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain. Decis. Support Syst. 50 (2011) 539–547. | DOI

[30] B. Sarkar, An inventory model with reliability in an imperfect production process. Appl. Math. Comput. 218 (2012) 4881–4891. | MR | Zbl

[31] B. Sarıoğlu and E. A. Durmuş, Manufacture and testing of air springs used in railway vehicles. Arab. J. Sci. Eng. 44 (2019) 7967–7977. | DOI

[32] N. H. Shah, M. Y. Jani and U. Chaudhari, Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand. Math. Comput. Model. Dyn. Syst. 24 (2017) 1–11. | MR | DOI

[33] A. A. Shaikh, S. C. Das, A. K. Bhunia, G. C. Panda and M. A. A. Khan, A two-warehouse EOQ model with interval-valued inventory cost and advance payment for deteriorating item under particle swarm optimization. Soft Comput. 23 (2019) 13531–13546. | DOI

[34] A. A. Shaikh, L. E. Cárdenas-Barrón, A. K. Bhunia and S. Tiwari, An inventory model of a three parameter Weibull distributed deteriorating item with variable demand dependent on price and frequency of advertisement under trade credit. RAIRO: OR 53 (2019) 903–916. | MR | Zbl | Numdam | DOI

[35] C. C. Sherbrooke, A multi-echelon technique for recoverable item control. Oper. Res. 16 (1968) 122–141. | DOI

[36] P. Supakar and S. K. Mahato, Fuzzy-stochastic advance payment inventory model having no shortage and with uniform demand using abc algorithm. Int. J. Appl. Comput. Math. 4 (2018) 107. | MR | DOI

[37] A. A. Taleizadeh, Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering. Int. Trans. Oper. Res. 24 (2017) 783–800. | MR | DOI

[38] A. A. Taleizadeh, D. W. Pentico, M. S. Jabalameli and M. Aryanezhad, An economic order quantity model with multiple partial prepayments and partial backordering. Math. Comput. Model. 57 (2013) 311–323. | MR | Zbl | DOI

[39] J. T. Teng, L. E. Cárdenas-Barrón, H. J. Chang, J. Wu and Y. Hu, Inventory lot-size policies for deteriorating items with expiration dates and advance payments. Appl. Math. Model. 40 (2016) 8605–8616. | MR | DOI

[40] S. Tiwari, A. H. Nobil and L. E. Cárdenas-Barrón, Note on Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Int. J. Appl. Comput. Math. 5 (2019) 83. | MR | DOI

[41] W. Yang, F. T. S. Chan and V. Kumar, Optimizing replenishment polices using Genetic Algorithm for single-warehouse multi-retailer system. Expert Syst. Appl. 39 (2012) 3081–3086. | DOI

[42] J. Yu, B. R. Sarker, Q. Duan and B. Wu, Single-manufacturer, multi-retailer consignment policy for retailers’ generalized demand distributions. J. Oper. Res. Soc. 63 (2012) 1708–1719. | DOI

[43] A. X. Zhang, Optimal advance payment scheme involving fixed per-payment costs. Omega 24 (1996) 577–582. | DOI

Cité par Sources :