Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
RAIRO. Operations Research, Tome 55 (2021), pp. S1469-S1485

This study explores simultaneous reduction strategies of lead time and setup cost in a two-stage supply chain model under trade-credit financing. Lead time depends on a variable production rate and lot size. It consists of setup, production, and transportation time which are shortened to reduce lead time. Although double safety factors are considered to avoid stock-out; but still backorders take place as the demand during the lead time is stochastic. Setup cost is reduced by including an extra investment cost. In addition, the vendor offers a fixed credit period to the buyer to settle the account. The objective is to minimize the integrated expected total cost and optimize the order quantity, number of deliveries, setup and transportation time, setup cost, safety factor for the first batch, and the production rate. A multi-variable optimization technique is used for these purposes. Furthermore, a numerical example together with managerial insights is provided for the establishment and applicability of the proposed model. The numerical results show that the introduction of setup cost reduction and trade-credit financing along with lead time reduction is more beneficial by means of integrated expected total cost reduction.

DOI : 10.1051/ro/2020112
Classification : 90B05
Keywords: Supply chain, inventory, stochastic demand, variable production rate, lead time, setup cost reduction, trade-credit
@article{RO_2021__55_S1_S1469_0,
     author = {Das Roy, Monami and Sana, Shib Sankar},
     title = {Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing},
     journal = {RAIRO. Operations Research},
     pages = {S1469--S1485},
     year = {2021},
     publisher = {EDP-Sciences},
     volume = {55},
     doi = {10.1051/ro/2020112},
     mrnumber = {4223193},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2020112/}
}
TY  - JOUR
AU  - Das Roy, Monami
AU  - Sana, Shib Sankar
TI  - Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
JO  - RAIRO. Operations Research
PY  - 2021
SP  - S1469
EP  - S1485
VL  - 55
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2020112/
DO  - 10.1051/ro/2020112
LA  - en
ID  - RO_2021__55_S1_S1469_0
ER  - 
%0 Journal Article
%A Das Roy, Monami
%A Sana, Shib Sankar
%T Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing
%J RAIRO. Operations Research
%D 2021
%P S1469-S1485
%V 55
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2020112/
%R 10.1051/ro/2020112
%G en
%F RO_2021__55_S1_S1469_0
Das Roy, Monami; Sana, Shib Sankar. Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing. RAIRO. Operations Research, Tome 55 (2021), pp. S1469-S1485. doi: 10.1051/ro/2020112

M. Ben-Daya and M. Hariga, Integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 92 (2004) 75–80. | DOI

M. Bhattacharyya and S. S. Sana, A mathematical model on eco-friendly manufacturing system under probabilistic demand. RAIRO:OR 53 (2019) 1899–1913. | MR | Zbl | Numdam | DOI

L. H. Chen and F. S. Kang, Coordination between vendor and buyer considering trade credit and items of imperfect quality. Int. J. Prod. Econ. 123 (2010) 52–61. | DOI

K. J. Chung and L. E. Cárdenas-Barrón, The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management. Appl. Math. Model. 37 (2013) 4653–4660. | MR | DOI

M. Das Roy, An EPQ model with variable production rate and markdown policy for stock and sales price sensitive demand with deterioration. Int. J. Eng. Sc. Math. 7 (2018) 260–268.

M. Das Roy, A nonlinear EOQ model for time-dependent demand, deterioration, shortages with inflation. Int. J. Manage. Technol. Eng. 8 (2018) 1574–1584.

M. Das Roy, Integrated supply chain model with setup cost reduction, exponential lead time crashing cost, rework and uncertain demand. Int. J. Res. Eng. Appl. Manage. 5 (2019) 752–757.

M. Das Roy, Combine effect of quality, setup and ordering cost control in a three-stage multi-item supply chain model with transportation discounts. Int. J. Anal. Exp. Mod. Anal. 12 (2020) 470–479.

M. Das Roy, Lead-time dependent ordering cost reduction and trade-credit: A supply chain model with stochastic demand and rework. Int. J. Rec. Tech. Eng. 8 (2020) 1–5.

M. Das Roy and S. Sana, Random sales price-sensitive stochastic demand: An imperfect production model with free repair warranty. J. Adv. Manage. Res. 14 (2017) 408–424. | DOI

M. Das Roy, S. Sana and K. Chaudhuri, A stochastic EPLS model with random price sensitive demand. Int. J. Manage. Sci. Eng. Manage. 5 (2010) 465–472.

M. Das Roy, S. Sana and K. Chaudhuri, An economic order quantity model of imperfect quality items with partial backlogging. Int. J. Syst. Sci. 42 (2011) 1409–1419. | MR | Zbl | DOI

M. Das Roy, S. Sana and K. Chaudhuri, An optimal shipment strategy for imperfect items in a stock-out situation. Math. Comput. Model. 54 (2011) 2528–2543. | MR | Zbl | DOI

M. Das Roy, S. Sana and K. Chaudhuri, An integrated producer–buyer relationship in the environment of EMQ and JIT production systems. Int. J. Prod. Res. 50 (2012) 5597–5614. | DOI

M. Das Roy, S. Sana and K. Chaudhuri, An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA J. Manage. Math. 25 (2014) 159–183. | MR | Zbl

B. K. Dey, S. Pareek, M. Tayyab and B. Sarkar, Autonomation policy to control work-in-process inventory in a smart production system. To appear in: Int. J. Prod. Res. (2020). DOI: . | DOI

C. H. Glock, Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. | DOI

Y. C. Hsiao, A note on integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 114 (2008) 294–297. | DOI

C. K. Huang, D. M. Tsai, J. C. Wu and K. J. Chung, An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. Int. J. Prod. Econ. 128 (2010) 445–451. | DOI

M. Y. Jaber and I. H. Osman, Coordinating a two-level supply chain with delay in payments and profit sharing. Comput. Ind. Eng. 50 (2006) 385–400. | DOI

U. S. Karmarker, Lot sizes, lead times and in-process inventories. Manage. Sci. 33 (1987) 409–418. | MR | Zbl | DOI

J. S. Kim and W. C. Benton, Lot size dependent lead times in a Q, R inventory system. Int. J. Prod. Res. 33 (1995) 41–58. | Zbl | DOI

S. J. Kim and B. Sarkar, Supply chain model with stochastic lead time, trade-credit financing, and transportation discount. To appear in: Math. Prob. Eng. 2017 (2017) 6465912. | MR | DOI

A. Khanna, P. Gautam, B. Sarkar and C. K. Jaggi, Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO:OR 54 (2020) 435–450. | MR | Numdam | DOI

M. Khouja and A. Mehrez, Economic production lot size model with variable production rate and imperfect quality. J. Oper. Res. Soc. 45 (1994) 1405–1417. | Zbl | DOI

M. Lashgari, A. A. Taleizadeh and S. S. Sana, An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J. Ind. Manage. Opt. 12 (2016) 1091–1119. | MR | DOI

J. Y. Lee, R. K. Cho and S. K. Paik, Supply chain coordination in vendor-managed inventory systems with stockout-cost sharing under limited storage capacity. Eur. J. Oper. Res. 248 (2016) 95–106. | MR | DOI

Y. Li, X. Xu, X. Zhao, J. H. Y. Yeung and F. Ye, Supply chain coordination with controllable lead time and asymmetric information. Eur. J. Oper. Res. 217 (2012) 108–119. | MR | Zbl | DOI

C. J. Liao and C. H. Shyu, An analytical determination of lead time with normal demand. Int. J.Oper. Prod. Manage. 11 (1991) 72–78. | DOI

Y. J. Lin, An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput. Ind. Eng. 56 (2009) 1597–1606. | DOI

D. R. Mahapatra, S. Panda and S. S. Sana, Multi-choice and stochastic programming for transportation problem involved in supply of foods and medicines to hospitals with consideration of logistic distribution. RAIRO:OR 54 (2020) 1119–1132. | MR | Numdam | DOI

M. K. Maiti and M. Maiti, Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm. Eur. J.Oper. Res. 179 (2007) 352–371. | Zbl | DOI

A. I. Malik and B. Sarkar, Disruption management in a constrained multi-product imperfect production system. J. Manuf. Sys. 56 (2020) 227–240. | DOI

L. Y. Ouyang and H. C. Chang, Lot size reorder point inventory model with controllable lead time and set-up cost. Int. J. Sys. Sci. 33 (2002) 635–642. | MR | Zbl | DOI

B. Pal, S. S. Sana and K. Chaudhuri, Two-echelon competitive integrated supply chain model with price and credit period dependent demand. Int. J. Syst. Sci. 47 (2016) 995–1007. | MR | DOI

J. C. H. Pan and M. C. Lo, The learning effect on setup cost reduction for mixture inventory models with variable lead time. Asian Pac. J. Oper. Res. 25 (2008) 513–529. | MR | Zbl | DOI

E. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Opers. Res. 34 (1986) 137–144. | Zbl | DOI

B. Sarkar, Mathematical and analytical approach for the management of defective items in a multi-stage production system. J. Clean. Prod. 218 (2019) 896–919. | DOI

B. Sarkar and I. Moon, Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI

B. Sarkar and M. Sarkar, How does an industry reduce waste and consumed energy within a multi-stage smart sustainable biofuel production system? J. Clean. Prod. 262 (2020) 121–200. | DOI

B. Sarkar, R. Guchhait, M. Sarkar and L. E. Cárdenas-Barrón, How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework? Int. J. Prod. Econ. 213 (2019) 243–257. | DOI

B. Sarkar, R. Guchhait, M. Sarkar, S. Pareek and N. Kim, Impact of safety factors and setup time reduction in a two-echelon supply chain management. Robot. Comput.-Integ. Manuf. 55 (2019) 250–258. | DOI

B. R. Sarker and E. R. Coates, Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. Int. J. Prod. Econ. 49 (1997) 237–247. | DOI

N. Saxena, S. R. Singh and S. S. Sana, A green supply chain model of vendor and buyer for remanufacturing. RAIRO: OR 51 (2017) 1133–1150. | MR | Zbl | Numdam | DOI

N. Saxena, B. Sarkar and S. R. Singh, Selection of remanufacturing/production cycles with an alternative market: a perspective on waste management. J. Clean. Prod. 245 (2020) 118935. | DOI

M. Tayyab, J. Jemai, H. Lim and B. Sarkar, A sustainable development framework for a cleaner multi-item multi-stage textile production system with a process improvement initiative. J. Clean. Prod. 246 (2020) 119055. | DOI

S. Tiwari, S. S. Sana and S. Sarkar, Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Rev. Real Acad. Ciencias Exactas Físicas Nat. Ser. 112 (2018) 1075–1099. | MR

R. Uthayakumar and S. Priyan, Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint. Int. J. Inf. Manage. Sci. 24 (2013) 193–211. | MR

R. Udayakumar, K. V. Geetha and S. S. Sana, Economic ordering policy for non-instantaneous deteriorating items with price and advertisement dependent demand and permissible delay in payment under inflation. To appear in: Math. Meth. Appl. Sci. (2020) DOI: . | DOI | MR

H. M. Wee, J. F. Jong and J. C. Jiang, A note on a single-vendor and multiple buyers production-inventory policy for a deteriorating item. Eur. J. Oper. Res. 180 (2007) 1130–1134. | Zbl | DOI

J. S. Yang and J. C. H. Pan, Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 42 (2004) 853–863. | Zbl | DOI

Cité par Sources :