This study explores simultaneous reduction strategies of lead time and setup cost in a two-stage supply chain model under trade-credit financing. Lead time depends on a variable production rate and lot size. It consists of setup, production, and transportation time which are shortened to reduce lead time. Although double safety factors are considered to avoid stock-out; but still backorders take place as the demand during the lead time is stochastic. Setup cost is reduced by including an extra investment cost. In addition, the vendor offers a fixed credit period to the buyer to settle the account. The objective is to minimize the integrated expected total cost and optimize the order quantity, number of deliveries, setup and transportation time, setup cost, safety factor for the first batch, and the production rate. A multi-variable optimization technique is used for these purposes. Furthermore, a numerical example together with managerial insights is provided for the establishment and applicability of the proposed model. The numerical results show that the introduction of setup cost reduction and trade-credit financing along with lead time reduction is more beneficial by means of integrated expected total cost reduction.
Keywords: Supply chain, inventory, stochastic demand, variable production rate, lead time, setup cost reduction, trade-credit
@article{RO_2021__55_S1_S1469_0,
author = {Das Roy, Monami and Sana, Shib Sankar},
title = {Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing},
journal = {RAIRO. Operations Research},
pages = {S1469--S1485},
year = {2021},
publisher = {EDP-Sciences},
volume = {55},
doi = {10.1051/ro/2020112},
mrnumber = {4223193},
language = {en},
url = {https://www.numdam.org/articles/10.1051/ro/2020112/}
}
TY - JOUR AU - Das Roy, Monami AU - Sana, Shib Sankar TI - Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing JO - RAIRO. Operations Research PY - 2021 SP - S1469 EP - S1485 VL - 55 PB - EDP-Sciences UR - https://www.numdam.org/articles/10.1051/ro/2020112/ DO - 10.1051/ro/2020112 LA - en ID - RO_2021__55_S1_S1469_0 ER -
%0 Journal Article %A Das Roy, Monami %A Sana, Shib Sankar %T Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing %J RAIRO. Operations Research %D 2021 %P S1469-S1485 %V 55 %I EDP-Sciences %U https://www.numdam.org/articles/10.1051/ro/2020112/ %R 10.1051/ro/2020112 %G en %F RO_2021__55_S1_S1469_0
Das Roy, Monami; Sana, Shib Sankar. Production rate and lot-size dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing. RAIRO. Operations Research, Tome 55 (2021), pp. S1469-S1485. doi: 10.1051/ro/2020112
and , Integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 92 (2004) 75–80. | DOI
and , A mathematical model on eco-friendly manufacturing system under probabilistic demand. RAIRO:OR 53 (2019) 1899–1913. | MR | Zbl | Numdam | DOI
and , Coordination between vendor and buyer considering trade credit and items of imperfect quality. Int. J. Prod. Econ. 123 (2010) 52–61. | DOI
and , The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management. Appl. Math. Model. 37 (2013) 4653–4660. | MR | DOI
, An EPQ model with variable production rate and markdown policy for stock and sales price sensitive demand with deterioration. Int. J. Eng. Sc. Math. 7 (2018) 260–268.
, A nonlinear EOQ model for time-dependent demand, deterioration, shortages with inflation. Int. J. Manage. Technol. Eng. 8 (2018) 1574–1584.
, Integrated supply chain model with setup cost reduction, exponential lead time crashing cost, rework and uncertain demand. Int. J. Res. Eng. Appl. Manage. 5 (2019) 752–757.
, Combine effect of quality, setup and ordering cost control in a three-stage multi-item supply chain model with transportation discounts. Int. J. Anal. Exp. Mod. Anal. 12 (2020) 470–479.
, Lead-time dependent ordering cost reduction and trade-credit: A supply chain model with stochastic demand and rework. Int. J. Rec. Tech. Eng. 8 (2020) 1–5.
and , Random sales price-sensitive stochastic demand: An imperfect production model with free repair warranty. J. Adv. Manage. Res. 14 (2017) 408–424. | DOI
, and , A stochastic EPLS model with random price sensitive demand. Int. J. Manage. Sci. Eng. Manage. 5 (2010) 465–472.
, and , An economic order quantity model of imperfect quality items with partial backlogging. Int. J. Syst. Sci. 42 (2011) 1409–1419. | MR | Zbl | DOI
, and , An optimal shipment strategy for imperfect items in a stock-out situation. Math. Comput. Model. 54 (2011) 2528–2543. | MR | Zbl | DOI
, and , An integrated producer–buyer relationship in the environment of EMQ and JIT production systems. Int. J. Prod. Res. 50 (2012) 5597–5614. | DOI
, and , An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA J. Manage. Math. 25 (2014) 159–183. | MR | Zbl
, , and , Autonomation policy to control work-in-process inventory in a smart production system. To appear in: Int. J. Prod. Res. (2020). DOI: . | DOI
, Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. | DOI
, A note on integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 114 (2008) 294–297. | DOI
, , and , An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. Int. J. Prod. Econ. 128 (2010) 445–451. | DOI
and , Coordinating a two-level supply chain with delay in payments and profit sharing. Comput. Ind. Eng. 50 (2006) 385–400. | DOI
, Lot sizes, lead times and in-process inventories. Manage. Sci. 33 (1987) 409–418. | MR | Zbl | DOI
and , Lot size dependent lead times in a Q, R inventory system. Int. J. Prod. Res. 33 (1995) 41–58. | Zbl | DOI
and , Supply chain model with stochastic lead time, trade-credit financing, and transportation discount. To appear in: Math. Prob. Eng. 2017 (2017) 6465912. | MR | DOI
, , and , Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO:OR 54 (2020) 435–450. | MR | Numdam | DOI
and , Economic production lot size model with variable production rate and imperfect quality. J. Oper. Res. Soc. 45 (1994) 1405–1417. | Zbl | DOI
, and , An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J. Ind. Manage. Opt. 12 (2016) 1091–1119. | MR | DOI
, and , Supply chain coordination in vendor-managed inventory systems with stockout-cost sharing under limited storage capacity. Eur. J. Oper. Res. 248 (2016) 95–106. | MR | DOI
, , , and , Supply chain coordination with controllable lead time and asymmetric information. Eur. J. Oper. Res. 217 (2012) 108–119. | MR | Zbl | DOI
and , An analytical determination of lead time with normal demand. Int. J.Oper. Prod. Manage. 11 (1991) 72–78. | DOI
, An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput. Ind. Eng. 56 (2009) 1597–1606. | DOI
, and , Multi-choice and stochastic programming for transportation problem involved in supply of foods and medicines to hospitals with consideration of logistic distribution. RAIRO:OR 54 (2020) 1119–1132. | MR | Numdam | DOI
and , Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm. Eur. J.Oper. Res. 179 (2007) 352–371. | Zbl | DOI
and , Disruption management in a constrained multi-product imperfect production system. J. Manuf. Sys. 56 (2020) 227–240. | DOI
and , Lot size reorder point inventory model with controllable lead time and set-up cost. Int. J. Sys. Sci. 33 (2002) 635–642. | MR | Zbl | DOI
, and , Two-echelon competitive integrated supply chain model with price and credit period dependent demand. Int. J. Syst. Sci. 47 (2016) 995–1007. | MR | DOI
and , The learning effect on setup cost reduction for mixture inventory models with variable lead time. Asian Pac. J. Oper. Res. 25 (2008) 513–529. | MR | Zbl | DOI
, Optimal lot sizing, process quality improvement and setup cost reduction. Opers. Res. 34 (1986) 137–144. | Zbl | DOI
, Mathematical and analytical approach for the management of defective items in a multi-stage production system. J. Clean. Prod. 218 (2019) 896–919. | DOI
and , Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. | DOI
and , How does an industry reduce waste and consumed energy within a multi-stage smart sustainable biofuel production system? J. Clean. Prod. 262 (2020) 121–200. | DOI
, , and , How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework? Int. J. Prod. Econ. 213 (2019) 243–257. | DOI
, , , and , Impact of safety factors and setup time reduction in a two-echelon supply chain management. Robot. Comput.-Integ. Manuf. 55 (2019) 250–258. | DOI
and , Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. Int. J. Prod. Econ. 49 (1997) 237–247. | DOI
, and , A green supply chain model of vendor and buyer for remanufacturing. RAIRO: OR 51 (2017) 1133–1150. | MR | Zbl | Numdam | DOI
, and , Selection of remanufacturing/production cycles with an alternative market: a perspective on waste management. J. Clean. Prod. 245 (2020) 118935. | DOI
, , and , A sustainable development framework for a cleaner multi-item multi-stage textile production system with a process improvement initiative. J. Clean. Prod. 246 (2020) 119055. | DOI
, and , Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Rev. Real Acad. Ciencias Exactas Físicas Nat. Ser. 112 (2018) 1075–1099. | MR
and , Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint. Int. J. Inf. Manage. Sci. 24 (2013) 193–211. | MR
, and , Economic ordering policy for non-instantaneous deteriorating items with price and advertisement dependent demand and permissible delay in payment under inflation. To appear in: Math. Meth. Appl. Sci. (2020) DOI: . | DOI | MR
, and , A note on a single-vendor and multiple buyers production-inventory policy for a deteriorating item. Eur. J. Oper. Res. 180 (2007) 1130–1134. | Zbl | DOI
and , Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 42 (2004) 853–863. | Zbl | DOI
Cité par Sources :