Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review
RAIRO. Operations Research, Tome 55 (2021) no. 1, pp. 27-50

Flow shop scheduling is a type of scheduling where sequence follows for each job on a set of machines for processing. In practice, jobs in flow shops can arrive at irregular times, and the no-wait constraint allows the changes in the job order to flexibly manage such irregularity. The flexible flow shop scheduling problems with no-wait have mainly addressed for flow optimization on the shop floor in manufacturing, processing, and allied industries. The scope of this paper is to identify the literature available on permutation and non-permutation flow shop scheduling with no-wait constraint. This paper organizes scheduling problems based on performance measures of variability and shop environments. The extended summary of two/three-machine and m-machine problems has been compiled, including their objectives, algorithms, parametric considerations, and their findings. A systematic appearance of both conceptual and analytical results summarizes various advances of the no-wait constraint. The paper includes independently investigated problems and suggestions for future research directions.

DOI : 10.1051/ro/2020055
Classification : 97M40
Keywords: Flexible scheduling, flow shop, non-permutation, no-wait and permutation
@article{RO_2021__55_1_27_0,
     author = {Singh, Harpreet and Oberoi, Jaspreet Singh and Singh, Doordarshi},
     title = {Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review},
     journal = {RAIRO. Operations Research},
     pages = {27--50},
     year = {2021},
     publisher = {EDP-Sciences},
     volume = {55},
     number = {1},
     doi = {10.1051/ro/2020055},
     mrnumber = {4223876},
     language = {en},
     url = {https://www.numdam.org/articles/10.1051/ro/2020055/}
}
TY  - JOUR
AU  - Singh, Harpreet
AU  - Oberoi, Jaspreet Singh
AU  - Singh, Doordarshi
TI  - Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review
JO  - RAIRO. Operations Research
PY  - 2021
SP  - 27
EP  - 50
VL  - 55
IS  - 1
PB  - EDP-Sciences
UR  - https://www.numdam.org/articles/10.1051/ro/2020055/
DO  - 10.1051/ro/2020055
LA  - en
ID  - RO_2021__55_1_27_0
ER  - 
%0 Journal Article
%A Singh, Harpreet
%A Oberoi, Jaspreet Singh
%A Singh, Doordarshi
%T Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review
%J RAIRO. Operations Research
%D 2021
%P 27-50
%V 55
%N 1
%I EDP-Sciences
%U https://www.numdam.org/articles/10.1051/ro/2020055/
%R 10.1051/ro/2020055
%G en
%F RO_2021__55_1_27_0
Singh, Harpreet; Oberoi, Jaspreet Singh; Singh, Doordarshi. Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review. RAIRO. Operations Research, Tome 55 (2021) no. 1, pp. 27-50. doi: 10.1051/ro/2020055

J. B. Abikarram, K. Mcconky and R. Proano, Energy cost minimization for unrelated parallel machine scheduling under real time and demand charge pricing. J. Clean. Prod. 208 (2019) 232–242. | DOI

F. Ahmadizar and M. H. Farahani, A novel hybrid genetic algorithm for the open shop scheduling problem. Int. J. Adv. Manuf. Technol. 62 (2012) 775–787. | DOI

A. Al-Ahmari, A. Ur-Rehman and S. Ali, Decision support system for the selection of advanced manufacturing technologies. J. Eng. Res. 4 (2016) 130–150.

D. Alisantoso, L. P. Khoo and P. Y. Jiang, An immune algorithm approach to the scheduling of a flexible PCB flow shop. Int. J. Adv. Manuf. Technol. 22 (2003) 819–827. | DOI

A. Allahverdi and T. Aldowaisan, No-wait flowshops with bicriteria of makespan and total completion time. J. Oper. Res. Soc. 53 (2002) 1004–1015. | Zbl | DOI

A. Allahverdi, H. Aydilek and A. Aydilek, No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. Eur. J. Oper. Res. 269 (2018) 590–601. | MR | DOI

A. Allahverdi, H. Aydilek and A. Aydilek, No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan. Appl. Math. Comput. 365 (2020) 124688. | MR

H. Allaoui and A. Artiba, Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints. Comput. Ind. Eng. 47 (2004) 431–450. | DOI

S. Ashour, A branch-and-bound algorithm for flow shop scheduling problems. J. AIIE Trans. 2 (1970) 172–176. | DOI

M. Babaei, M. Mohammadi and S. M. T. F. Ghomi, A genetic algorithm for the simultaneous lot sizing and scheduling problem in capacitated flow shop with complex setups and backlogging. Int. J. Adv. Manuf. Technol. 70 (2014) 125–134. | DOI

D. Bai, J. Liang, B. Liu, M. Tang and Z. H. Zhang, Permutation flow shop scheduling problem to minimize nonlinear objective function with release dates. Comput. Ind. Eng. 112 (2017) 336–347. | DOI

D. Bai, M. Tang, Z. H. Zhang and D. R. S. G. Ernesto, Flow shop learning effect scheduling problem with release dates. Omega 78 (2018) 21–38. | DOI

J. Behnamian, Scheduling and worker assignment problems on hybrid flowshop with cost-related objective function, Int. J. Adv. Manuf. Technol. 74 (2014) 267–283. | DOI

I. Benkalai, D. Rebaine, C. Gagné and P. Baptiste, The migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent setup times. IFAC-PapersOnLine 49 (2016) 408–413. | DOI

M. Bessedik, F. B. S. Tayeb, H. Cheurfi and A. Blizak, An immunity-based hybrid genetic algorithms for permutation flowshop scheduling problems. Int. J. Adv. Manuf. Technol. 85 (2016) 2459–2469. | DOI

L. A. Bewoor, V. C. Prakash and S. U. Sapkal, Production scheduling optimization in foundry using hybrid particle swarm optimization algorithm. Proc. Manuf. 22 (2017) 57–64.

A. Biele and L. Mönch, Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines. Comput. Oper. Res. 103 (2019) 134–147. | MR | DOI

W. Bozejko, M. Uchronski and M. Wodecki, Parallel metaheuristics for the cyclic flow shop scheduling problem. Comput. Ind. Eng. 95 (2016) 156–163. | DOI

W. Bozejko, Z. Hejducki and M. Wodecki, Flowshop scheduling of construction processes with uncertain parameters. Arch. Civil Mech. Eng. 19 (2019) 194–204. | DOI

A. P. J. Brown and Z. A. Lomnicki, Some applications of the branch-and-bound algorithm to the machine scheduling problem. Oper. Res. Soc. 17 (1966) 173–186. | DOI

M. Bultmann, S. Knust and S. Waldherr, Synchronous flow shop scheduling with pliable jobs. Eur. J. Oper. Res. 270 (2018) 943–956. | MR | DOI

H. G. Campbell, R. A. Dudek and M. L. Smith, A heuristic algorithm for the n Job, m machine sequencing problem. Manage. Sci. 16 (1970) 630–637. | Zbl | DOI

C. Y. Cheng, K. C. Ying, S. F. Li and Y. C. Hsieh, Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times. Comput. Ind. Eng. 130 (2019) 338–347. | DOI

H. M. Cho and I. J. Jeong, A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shop. Comput. Ind. Eng. 106 (2017) 174–181. | DOI

R. W. Conway, W. L. Maxwell and L. W. Miller, Theory of Scheduling. Addison-Wesley Publishing, Reading, MA (1967). | MR | Zbl

F. D. Croce, A. Grosso and F. Salassa, Minimizing total completion time in the two-machine no-idle no-wait flow shop problem. J. Heuristics (2019) 1–15. DOI: . | DOI

R. L. Daniels and J. B. Mazzola, A tabu-search heuristic for the flexible-resource flow shop scheduling problem. Ann. Oper. Res. 41 (1993) 207–230. | Zbl | DOI

G. Deng and X. Gu, A hybrid discrete differential evolution algorithm for the no-idle permutation flow shop scheduling problem with makespan criterion. Comput. Oper. Res. 39 (2012) 2152–2160. | MR | Zbl | DOI

J. Deng and L. Wang, A competitive memetic algorithm for multi-objective distributed permutation flow shop scheduling problem. Swarm Evol. Comput. 32 (2017) 121–131. | DOI

E. Dhouib, J. Teghem and T. Loukil, Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic. Ann. Oper. Res. 267 (2018) 101–134. | MR | DOI

J. Y. Ding, S. Song and C. Wu, Carbon-efficient scheduling of flow shops by multi-objective optimization. Eur. J. Oper. Res. 248 (2016) 758–771. | MR | DOI

M. Dios, V. Fernandez-Viagas and J. M. Framinan, Efficient heuristics for the hybrid flow shop scheduling problem with missing operations. Comput. Ind. Eng. 115 (2018) 88–99. | DOI

R. Dubey and A. Gunasekaran, Strategic Management of Sustainable Manufacturing Operation. IGI Global, Hersheys, PE (2016). | DOI

R. G. Dyson, Maximin programming, fuzzy linear programming and multi-criteria decision making. J. Oper. Res. Soc. 31 (1980) 263–267. | Zbl | DOI

M. Ebrahimi, S. M. T. F. Ghomi and B. Karimi, Hybrid flow shop scheduling with sequence-dependent family setup time and uncertain due dates. Appl. Math. Model. 38 (2013) 2490–2504. | MR | DOI

O. Engin and A. Güçlü, A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems. Appl. Soft Comput. 72 (2018) 166–176. | DOI

C. Fan, Y. Song and Q. Pei, Project schedule with alternative activities and relationships. J. Eng. Res. 5 (2017) 30–49.

P. Fattahi, S. M. H. Hosseini and F. Jolai, A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem. Int. J. Adv. Manuf. Technol. 65 (2013) 787–802. | DOI

A. Ferrer, D. Guimarans, H. Ramalhinho and A. A. Juan, A BRILS metaheuristic for non-smooth flow-shop problems with failure-risk costs. Expert Syst. App. 44 (2016) 177–186. | DOI

G. B. Fonseca, T. H. Nogueira and M. G. Ravetti, A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem. Eur. J. Oper. Res. 275 (2019) 139–154. | MR | DOI

Y. Fu, H. Wang, G. Tian, Z. Li and H. Hu, Two-agent stochastic flow shop deteriorating scheduling via a hybrid multi-objective evolutionary algorithm. J. Intell. Manuf. 30 (2018) 2257–2272. | DOI

J. Fung, Y. Zinder and G. Singh, Flexible flow shop with storage: complexity and optimisation methods. IFAC-PapersOnLine 49 (2016) 237–242. | DOI

K. Govindan, R. Balasundaram, N. Baskar and P. Asokan, A hybrid approach for minimizing makespan in permutation flowshop scheduling. J. Syst. Sci. Syst. Eng. 26 (2017) 50–76. | DOI

J. Grabowski and J. Pempera, New block properties for the permutation flow shop problem with application in tabu search. J. Oper. Res. Soc. 52 (2001) 210–220. | Zbl | DOI

J. Grabowski, E. Skubalska and C. Smutnicki, On flow shop scheduling with release and due dates to minimize maximum lateness. J. Oper. Res. Soc. 34 (1983) 615–620. | MR | Zbl | DOI

R. L. Graham, E. L. Lawler, J. K. Lenstra and A. H. G. Kan, Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Disc. Math. 5 (1979) 287–326. | MR | Zbl | DOI

A. Gunasekaran, T. Martikainen and P. Yli-Olli, Flexible manufacturing systems: an investigation for research and applications. Eur. J. Oper. Res. 66 (1993) 1–26. | DOI

J. N. D. Gupta, Flowshop schedules with sequence dependent setup times. J. Oper. Res. 29 (1986) 206–219. | MR | Zbl

J. N. D. Gupta and A. M. A. Hariri, Two-machine flowshop scheduling to minimize the number of tardy jobs. J. Oper. Res. Soc. 48 (1997) 212–220. | Zbl | DOI

W. Han and P. Dejax, An efficient heuristic based on machine workload for the flowshop scheduling problem with setup and removal. Ann. Oper. Res. 50 (1994) 263–279. | MR | Zbl | DOI

Y. Han, D. Gong, Y. Jin and Q. K. Pan, Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time. Appl. Soft Comput. 42 (2016) 229–245. | DOI

A. Janiak and M. C. Portmann, Genetic algorithm for the permutation flow-shop scheduling problem with linear models of operations. Ann. Oper. Res. 83 (1998) 95–114. | MR | Zbl | DOI

S. M. Johnson, Optimal two and three stage production schedules with setup times included. Nav. Res. Logist. 1 (1953) 61–68. | DOI

S. Karabati, P. Kouvelis and A. S. Kiran, Games, critical paths and assignment problems in permutation flow shops and cyclic scheduling flow line environments. J. Oper. Res. Soc. 43 (1992) 241–258. | Zbl | DOI

D. Khorasanian and G. Moslehi, Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption. Comput. Oper. Res. 79 (2017) 94–108. | MR | DOI

H. Kia, S. H. Ghodsypour and H. Davoudpour, New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times. J. Ind. Eng. Int. 13 (2017) 297–306. | DOI

H. J. Kim and J. H. Lee, Three-machine flow shop scheduling with overlapping waiting time constraints. Comput. Oper. Res. 101 (2019) 93–102. | MR | DOI

J. M. Kim, Y. D. Zhou and D. H. Lee, Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines. Int. J. Adv. Manuf. Technol. 91 (2017) 3697–3708. | DOI

G. M. Komaki, E. Teymourian, V. Kayvanfar and Z. Booyavi, Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem. Comput. Ind. Eng. 105 (2017) 158–173. | DOI

P. Kouvelis, R. L. Daniels and G. Vairaktarakis, Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Trans. 32 (2000) 421–432. | DOI

M. Kurdi, Ant colony system with a novel non-daemonactions procedure for multiprocessor task scheduling in multistage hybrid flow shop. Swarm Evol. Comput. 44 (2019) 987–1002. | DOI

J. L. Lalitha, N. Mohan and V. M. Pillai, Lot streaming in [N − 1](1) + N(m) hybrid flow shop. J. Manuf. Syst. 44 (2017) 12–21. | DOI

J. Y. Lee, Y. D. Kim and T. E. Lee, Minimizing total tardiness on parallel machines subject to flexible maintenance. Int. J. Ind. Eng.: Theory App. Pract. 25 (2018) 472–489.

K. Lee, F. Zheng and M. L. Pinedo, Online scheduling of ordered flow shops. Eur. J. Oper. Res. 272 (2019) 50–60. | MR | DOI

D. Lei and Y. Zheng, Hybrid flow shop scheduling with assembly operations and key objectives: a novel neighborhood search. Appl. Soft Comput. 61 (2017) 122–128. | DOI

Y. Li and G. Hu, Shop floor lot-sizing and scheduling with a two-stage stochastic programming model considering uncertain demand and workforce efficiency. Comput. Ind. Eng. 111 (2017) 263–271. | DOI

X. Li, Z. Yang, R. Ruiz, T. Chen and S. Sui, An iterated greedy heuristic for no-wait flow shops with sequence dependent setup times, learning and forgetting effects. Inf. Sci. 453 (2018) 408–425. | MR | DOI

C. J. Liao, Minimizing the number of machine idle intervals with minimum makespan in a flow-shop. J. Oper. Res. Soc. 44 (1993) 817–824. | Zbl | DOI

C. J. Liao, E. Tjandradjaja and T. P. Chung, An approach using particle swarm optimization and bottleneck heuristic to solve hybrid flow shop scheduling problem. Appl. Soft Comput. 12 (2012) 1755–1764. | DOI

G. E. Liepins and M. R. Hilliard, Genetic algorithms: foundations and applications. Ann. Oper. Res. 21 (1989) 31–57. | Zbl | DOI

K. S. Lin, Hybrid algorithm for sequencing with bicriteria. J. Optim. Theory App. 39 (1983) 105–124. | MR | Zbl | DOI

S. W. Lin and K. C. Ying, Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics. Omega 64 (2016) 115–125. | DOI

J. Lin, Z. J. Wang and X. Li, A Backtracking search hyper-heuristic for the distributed assembly flow-shop scheduling problem. Swarm Evol. Comput. 36 (2017) 124–135. | DOI

Y. Liu and Z. Feng, Two-machine no-wait flowshop scheduling with learning effect and convex resource-dependent processing times. Comput. Ind. Eng. 75 (2014) 170–175. | DOI

G. Liu, P. B. Luh and R. Resch, Scheduling permutation flow shops using the Lagrangian relaxation technique. Ann. Oper. Res. 70 (1997) 171–189. | MR | Zbl | DOI

G. S. Liu, Y. Zhou and H. D. Yang, Minimizing energy consumption and tardiness penalty for fuzzy flow shop scheduling with state-dependent setup time. J. Clean. Prod. 147 (2017) 470–484. | DOI

W. Liu, Y. Jin and M. Price, New meta-heuristic for dynamic scheduling in permutation flowshop with new order arrival. Int. J. Adv. Manuf. Technol. 98 (2018) 1817–1830. | DOI

Z. A. Lomnicki, A branch-and-bound algorithm for the exact solution of the three-machine scheduling problem. J. Oper. Res. Soc. 16 (1965) 89–100. | DOI

C. Low, J. Y. Yeh and K. I. Huang, A robust simulated annealing heuristic for flow shop scheduling problems. Int. J. Adv. Manuf. Technol. 23 (2004) 762–767. | DOI

M. K. Marichelvam, O. Tosun and M. Geetha, Hybrid monkey search algorithm for flow shop scheduling problem under makespan and total flow time. Appl. Soft Comput. 55 (2017) 82–92. | DOI

M. K. Marichelvam, M. Geetha and O. Tosun, An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors – a case study. Comput. Oper. Res. 114 (2020) 104812. | MR | DOI

O. Masmoudi, A. Yalaoui, Y. Ouazene and H. Chehade, Multi-item capacitated lot-sizing problem in a flow-shop system with energy consideration. IFAC Papers Proc. 49 (2016) 301–306.

G. B. Mcmohan and P. G. Burton, Flow-shop scheduling with the branch-and-bound method. Oper. Res. 15 (1967) 373–589.

R. G. R. Mercado and J. F. Bard, A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times. IIE Trans. 31 (1999) 721–731. | DOI

R. G. R. Mercado and J. F. Bard, An enhanced TSP-based heuristic for makespan minimization in a flow shop with a setup times. J. Heuristics 5 (1999) 53–70. | Zbl | DOI

G. Minella, R. Ruiz and M. Ciavotta, A review and evaluation of multiobjective algorithms for the flowshop scheduling problem. Informs J. Comput. 20 (2008) 451–471. | MR | Zbl | DOI

Y. Minyi, H. Jiye and C. Yongmao, Elimination conditions and lower bounds for the permutation flow shop scheduling problem. Acta Math. Appl. Sin. 2 (1985) 321–331. | Zbl | DOI

M. Mirabi, A novel hybrid genetic algorithm to solve the sequence-dependent permutation flow-shop scheduling problem. Int. J. Adv. Manuf. Technol. 71 (2014) 429–437. | DOI

A. Mishra and D. Shrivastava, A TLBO and a Jaya heuristics for permutation flow shop scheduling to minimize the sum of inventory holding and batch delay costs. Comput. Ind. Eng. 124 (2018) 509–522. | DOI

H. H. Miyata, M. S. Nagano and J. N. D. Gupta, Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependence-sequence setup times and makespan minimization. Comput. Ind. Eng. 135 (2019) 79–104. | DOI

V. Modrak, P. Semanco and P. Knuth, Alternative constructive heuristic algorithm for permutation flow shop scheduling problem with makespan criterion. Int. J. Ind. Eng.: Theory App. Pract. 19 (2012) 289–296.

K. Momaya, Strategic flexibility for competitiveness. Global J. Flexible Syst. Manage. 3 (2002) III.

M. F. Morais, M. G. Filho and T. J. P. Boiko, Hybrid flow shop scheduling problems involving setup considerations: a literature review and analysis. Int. J. Ind. Eng.: Theory App. Pract. 20 (2013) 614–630.

S. M. Mousavi, M. Mousakhani and M. Zandieh, Bi-objective hybrid flow shop scheduling: a new local search. Int. J. Adv. Manuf. Technol. 64 (2013) 933–950. | DOI

M. S. Nagano and J. V. Moccellin, A high-quality solution constructive heuristic for flow shop sequencing. J. Oper. Res. Soc. 53 (2002) 1374–1379. | Zbl | DOI

M. S. Nagano, A. A. Silva and L. A. N. Lorena, An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times. Expert Syst. App. 41 (2014) 3628–2633. | DOI

M. S. Nagano, F. L. Rossi and C. P. Tomazella, A new efficient heuristic method for minimizing the total tardiness in a no-idle permutation flow shop. Prod. Eng. 11 (2017) 523–529. | DOI

A. Nagar, S. S. Heragu and J. Haddock, A branch-and-bound approach for a two-machine flowshop scheduling problem. J. Oper. Res. Soc. 46 (1995) 721–734. | Zbl | DOI

A. Nagar, S. S. Heragu and J. Haddock, A combined branch-and-bound and genetic algorithm based approach for a flowshop scheduling problem. Ann. Oper. Res. 63 (1996) 397–414. | Zbl | DOI

J. Navaei, S. M. T. F. Ghomi, F. Jolai and A. Mozdgir, Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Comput. Oper. Res. 44 (2014) 52–65. | MR | Zbl | DOI

Z. H. A. O. Ning, Y. E. Song, L. I. Kaidian and C. H. E. N. Siyu, Effective iterated greedy algorithm for flow-shop scheduling problems with time lags. Chin. J. Mech. Eng. 30 (2017) 652–662. | DOI

N. Nouri and T. Ladhari, Evolutionary multi-objective optimization for the multi-machine flow shop scheduling problem under blocking. Ann. Oper. Res. 267 (2017) 413–430. | MR | DOI

C. Ozturk and M. A. Ornek, Optimization and constraint based heuristic methods for advanced planning and scheduling systems. Int. J. Ind. Eng.: Theory App. Pract. 23 (2016) 26–48.

D. S. Palmer, Sequencing jobs through a multi-stage process in the minimum total time – a quick method of obtaining a near optimum. J. Oper. Res. Soc. 16 (1965) 101–107. | DOI

Q. K. Pan and L. Wang, No-idle permutation flow shop scheduling based on a hybrid discrete particle swarm optimization algorithm. Int. J. Adv. Manuf. Technol. 39 (2008) 796–807. | DOI

Q. K. Pan, P. N. Suganthan, J. J. Liang and M. F. Tasgetiren, A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem. Expert Syst. App. 38 (2011) 3252–3259. | DOI

Q. K. Pan, L. Wang and L. Gao, A chaotic harmony search algorithm for the flow shop scheduling problem with limited buffers. Appl. Soft Comput. 11 (2011) 5270–5280. | DOI

Q. K. Pan, K. Gao, L. Wang, J. Liang and X. Y. Li, Effective heuristics and meta-heuristics to minimize total flowtime for the distributed permutation flowshop problem. Expert Syst. App. 124 (2019) 309–324. | DOI

S. S. Panwalkar, Scheduling of a two-machine flowshop with travel time between machines. J. Oper. Res. Soc. 42 (1991) 609–613. | Zbl | DOI

S. S. Panwalkar and C. R. Woollam, Ordered flow shop problems with no in-process waiting. J. Oper. Res. Soc. 31 (1980) 1039–1043. | MR | Zbl | DOI

L. S. Pessoa and C. E. Andrade, Heuristics for a flowshop scheduling problem with stepwise job objective function. Eur. J. Oper. Res. 266 (2018) 950–962. | MR | DOI

M. L. Pinedo, Scheduling: Theory, Algorithms, and Systems. 3rd edition, edited by M. L. Pinedo. Springer, New York, NY (2008). | MR | Zbl

M. L. Pinedo, Scheduling: Theory, Algorithms, and Systems. 4th edition, edited by M. L. Pinedo. Springer, New York, NY (2012). | MR | Zbl

C. N. Potts, An adaptive branching rule for the permutation flow-shop problem. Eur. J. Oper. Res. 5 (1980) 19–25. | MR | Zbl | DOI

R. Pugazhenthi and A. Xavior, A genetic algorithm applied heuristic to minimize the makespan in a flow shop. Proc. Eng. 97 (2014) 1735–1744. | DOI

S. Pugazhendhi, S. Thiagarajan, C. Rajendran and N. Anantharaman, Generating non-permutation schedules in flowline-based manufacturing systems with sequence-dependent setup times of jobs: a heuristic approach. Int. J. Adv. Manuf. Technol. 23 (2004) 64–78. | DOI

H. Qin, P. Fan, H. Tang, P. Huang, B. Fang and S. Pan, An effective hybrid discrete grey wolf optimizer for the casting production scheduling problem with multi-objective and multi-constraint. Comput. Ind. Eng. 128 (2019) 458–476. | DOI

G. Rabadi, Heuristics, Metaheuristics and Approximate Methods in Planning and Scheduling, edited by G. Rabadi, In Vol 236 of International Series in Operation Research and Management Science, Springer, New York, NY (2016) 127–140. | MR

C. Rajendran, A no-wait flow shop scheduling heuristic to minimize makespan. J. Oper. Res. Soc. 45 (1994) 472–478. | Zbl | DOI

R. Ramezanian, S. Mohammadi and A. Cheraghalikhani, Toward an integrated modeling approach for production and delivery operations in flow shop system: trade-off between direct and routing delivery methods. J. Manuf. Syst. 44 (2017) 79–92. | DOI

S. S. Reddi and C. V. Ramamoorthy, On the flow-shop scheduling problem with no-wait in process. J. Oper. Res. Soc. 23 (1972) 323–331. | Zbl | DOI

V. Riahi and M. Kazemi, A new hybrid ant colony algorithm for scheduling of no-wait flowshop. Oper. Res. 18 (2016) 55–74.

I. Ribas, R. Companys and X. Tort-Martorell, Efficient heuristics for the parallel blocking flow shop scheduling problem. Expert Syst. App. 74 (2017) 41–54. | DOI

I. Ribas, R. Companys and X. T. Martorell, An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem. Expert Syst. App. 121 (2019) 347–361. | DOI

J. Riezebos, G. J. Gaalman and J. N. Gupta, Flow shop scheduling with multiple operations and time lags. J. Intell. Manuf. 6 (1995) 105–115. | DOI

H. Rock, Some new results in flow shop scheduling. Z. Oper. Res. 28 (1984) 1–16. | MR | Zbl

M. A. Salido, J. Escamilla, A. Giret and F. Barber, A genetic algorithm for energy-efficiency in job-shop scheduling. Int. J. Adv. Manuf. Technol. 85 (2016) 1303–1314. | DOI

H. Samarghandi and M. Behroozi, An enumeration algorithm for the no-wait flow shop problem with due date constraints. IFAC-PapersOnLine 49 (2016) 1803–1808. | DOI

H. Samarghandi and M. Behroozi, On the exact solution of the no-wait flow shop problem with due date constraints. Comput. Oper. Res. 81 (2017) 41–159. | MR | DOI

S. U. Sapkal and D. Laha, A heuristic for no-wait flow shop scheduling. Int. J. Adv. Manuf. Technol. 68 (2013) 1327–1338. | DOI

O. Shahvari and R. Logendran, Hybrid flow shop batching and scheduling with a bi-criteria objective. Int. J. Prod. Econ. 179 (2016) 239–258. | DOI

O. Shahvari and R. Logendran, A comparison of two stage-based hybrid algorithms for a batch scheduling problem in hybrid flow shop with learning effect. Int. J. Prod. Econ. 195 (2018) 227–248. | DOI

W. Shao and D. Pi, A self-guided differential evolution with neighborhood search for permutation flow shop scheduling. Expert Syst. App. 51 (2016) 161–176. | DOI

W. Shao, D. Pi and Z. Shao, A hybrid discrete optimization algorithm based on teaching–probabilistic learning mechanism for no-wait flow shop scheduling. Knowl. Based Syst. 107 (2016) 219–234. | DOI

W. Shao, D. Pi and Z. Shao, An extended teaching-learning based optimization algorithm for solving no-wait flow shop scheduling problem. Appl. Soft Comput. 61 (2017) 193–210. | DOI

W. Shao, D. Pi and Z. Shao, Memetic algorithm with node and edge histogram for no-idle flow shop scheduling problem to minimize the makespan criterion. Appl. Soft Comput. 54 (2017) 164–182. | DOI

Z. Shao, D. Pi and W. Shao, Self-adaptive discrete invasive weed optimization for the blocking flow-shop scheduling problem to minimize total tardiness. Comput. Ind. Eng. 111 (2017) 331–351. | DOI

Z. Shao, D. Pi, W. Shao and P. Yuan, An efficient discrete invasive weed optimization for blocking flow-shop scheduling problem. Eng. App. Artif. Intell. 78 (2019) 124–141. | DOI

Z. Shao, D. Pi and W. Shao, A novel multi-objective discrete water wave optimization for solving multi-objective blocking flow-shop scheduling problem. Knowl. Based Syst. 165 (2019) 110–131. | DOI

O. P. Sharma and P. Sushil, Issues in managing manufacturing flexibility. Global J. Flexible Syst. Manage. 3 (2002) 11–29.

M. Sheikhalishahi, N. Eskandari, A. Mashayekhi and A. Azadeh, Multi-objective open shop scheduling by considering human error and preventive maintenance. Appl. Math. Model. 67 (2019) 573–587. | MR | DOI

A. Sioud and C. Gagné, Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times. Eur. J. Oper. Res. 264 (2018) 66–73. | MR | DOI

H. Singh, J. S. Oberoi and D. Singh, Decision-making approaches and heuristics algorithms for multi-objective flow shop scheduling. Int. J. Res. Eng. App. Manage. 5 (2019) 60–66.

H. Singh, J. S. Oberoi and D. Singh, Optimizing a multi-objective flow shop scheduling problem by meta-heuristic approach. Int. J. Res. Eng. App. Manage. 5 (2019) 20–26.

R. D. Smith and R. A. Dudek, A general algorithm for solution of the n -job, M -machine sequencing problem of the flow shop. Oper. Res. 15 (1967) 71–82. | Zbl | DOI

C. Smutnicki, A two-machine permutation flow shop scheduling problem with buffers. OR Spectr. 20 (1998) 229–235. | MR | Zbl | DOI

Y. N. Sotskov, T. Tautenhahn and F. Werner, Heuristics for permutation flow shop scheduling with batch setup times. OR Spectr. 18 (1996) 67–80. | Zbl | DOI

V. A. Strusevich and C. M. Zwaneveld, On non-permutation solutions to some two machine flow shop scheduling problems. Z. Oper. Res. 39 (1994) 305–319. | MR | Zbl

W. Sukkerd and T. Wuttipornpun, Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations. Comput. Ind. Eng. 97 (2016) 157–169. | DOI

W. Szwarc, The clustered flow-shop problem. J. Oper. Res. 32 (1988) 315–322. | MR | Zbl

W. Szwarc and J. J. Liu, An approximate solution of the flow-shop problem with sequence dependent setup times. J. Oper. Res. 33 (1989) 439–451. | MR | Zbl

B. Tadayon and N. Salmasi, A two-criteria objective function flexible flow shop scheduling problem with machine eligibility constraint. Int. J. Adv. Manuf. Technol. 64 (2013) 1001–1015. | DOI

M. Tandon, P. T. Cummings and M. D. Levan, Flowshop sequencing with non-permutation schedules. Comput. Chem. Eng. 15 (1991) 601–607. | DOI

M. K. Tiwari and N. K. Vidyarthi, Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach. Int. J. Prod. Res. 38 (2000) 3357–3384. | Zbl | DOI

V. T’Kindt and J. C. Billaut, Multicriteria Scheduling: Theory, Models and Algorithms, 2nd edition, edited by V. T’Kindt and J. C. Billaut. Springer-Verlag, Berlin-Heidelberg (2005). | Zbl

V. Tkindt, N. Monmarche, F. Tercinet and D. Laugt, An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem. Eur. J. Oper. Res. 142 (2002) 250–257. | MR | Zbl | DOI

M. Torkashvand, B. Naderi and S. A. Hosseini, Modelling and scheduling multi-objective flow shop problems with interfering jobs. Appl. Soft Comput. 54 (2017) 221–228. | DOI

M. Urgo, A branch-and-bound approach to schedule a no-wait flow shop to minimize the CVaR of the residual work content. Comput. Ind. Eng. 129 (2019) 67–75. | DOI

J. A. A. Veen and R. Dal, Solvable cases of the no-wait flow shop scheduling problem. J. Oper. Res. Soc. 22 (1991) 971–980. | Zbl | DOI

S. Wang and M. Liu, A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem. Comput. Oper. Res. 40 (2013) 1064–1075. | MR | DOI

S. Y. Wang, L. Wang, M. Liu and Y. Xu, An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem. Int. J. Prod. Econ. 145 (2013) 387–396. | DOI

X. Y. Wang, Z. Zhou, X. Zhang, P. Ji and J. B. Wang, Several flow shop scheduling problems with truncated position-based learning effect. Comput. Oper. Res. 40 (2013) 2906–2929. | MR | DOI

X. Wu and A. Che, Energy-efficient no-wait permutation flow shop scheduling by adaptive multi-objective variable neighborhood search. Omega 94 (2019) 102117. | DOI

Y. Xiao, Y. Yuan, R. Q. Zhang and A. Konak, Non-permutation flow shop scheduling with order acceptance and weighted tardiness. Appl. Math. Comput. 270 (2015) 312–333. | MR

B. Yagmahan and M. M. Yenisey, A multi-objective ant colony system algorithm for flow shop scheduling problem. Expert Syst. App. 37 (2010) 1361–1368. | DOI

J. Yan, L. Li, F. Zhao, F. Zhang and Q. Zhao, A multi-level optimization approach for energy-efficient flexible flowshop scheduling. J. Clean. Prod. 137 (2016) 1543–1552. | DOI

S. Yanai and T. Fujie, A three-machine permutation flow-shop problem with minimum makespan on the second machine. J. Oper. Res. Soc. 57 (2006) 460–468. | Zbl | DOI

H. Ye, W. Li and A. Abedini, An improved heuristic for no-wait flow shop to minimize makespan. J. Manuf. Syst. 44 (2017) 273–279. | DOI

K. C. Ying, Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic. Int. J. Adv. Manuf. Technol. 38 (2008) 348–354. | DOI

K. C. Ying and S. W. Lin, Multi-heuristic desirability ant colony system heuristic for non-permutation flowshop scheduling problems. Int. J. Adv. Manuf. Technol. 33 (2007) 793–802. | DOI

K. C. Ying and S. W. Lin, Minimizing makespan for no-wait flowshop scheduling problems with setup times. Comput. Ind. Eng. 121 (2018) 73–81. | DOI

Y. Yip, C. Y. Cheng and C. Low, Sequencing of an M machine flow shop with setup, processing and removal times separated. Int. J. Adv. Manuf. Technol. 30 (2006) 286–296. | DOI

A. J. Yu and J. Seif, Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA. Comput. Ind. Eng. 97 (2016) 26–40. | DOI

C. Yu, Q. Semeraro and A. Matta, A genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibility. Comput. Oper. Res. 100 (2018) 211–229. | MR | DOI

Y. Zhai, K. Biel, F. Zhao and J. W. Sutherland, Dynamic scheduling of a flow shop with on-site wind generation for energy cost reduction under real-time electricity pricing. CIRP Ann. Manuf. Technol. 66 (2017) 41–44. | DOI

F. Zhao, Y. Liu, Y. Zhang, W. Ma and C. Zhang, A hybrid harmony search algorithm with efficient job sequence scheme and variable neighborhood search for the permutation flow shop scheduling problems. Eng. App. Artif. Intell. 65 (2017) 178–199. | DOI

F. Zhao, H. Liu, Y. Zhang, W. Ma and C. Zhang, A discrete water wave optimization algorithm for no-wait flow shop scheduling problems. Expert Syst. App. 91 (2018) 347–363. | DOI

F. Zhao, L. Zhang, H. Liu, Y. Zhang, W. Ma, C. Zhang and H. Song, An improved water wave optimization algorithm with the single wave mechanism for the no-wait flow-shop scheduling problem. J. Eng. Optim. 51 (2018) 1727–1742. | MR | DOI

F. Zhao, S. Qin, G. Yang, W. Ma, C. Zhang and H. Song, A factorial based particle swarm optimization with a population adaptation mechanism for the no-wait flow shop scheduling problem with the makespan objective. Expert Syst. App. 126 (2019) 41–53. | DOI

F. Zhao, S. Qin, Y. Zhang, W. Ma, C. Zhang and H. Song, A hybrid biogeography-based optimization with variable neighborhood search mechanism for no-wait flow shop scheduling problem. Expert Syst. App. 126 (2019) 321–339. | DOI

H. Zhonghua, Z. Boqiu, L. Hao and G. Wei, Bat algorithm for flexible flow shop scheduling with variable processing time. In: Vol. 690 of Part of the Advances in Intelligent Systems and Computing Book Series. In ICMIR’ 17: Proceedings of International Conference on Mechatronics and Intelligent Robotics. (AISC) 1 (2017) 164–171. https://link.springer.com/conference/icmir.

A. Ziaeifar, R. Tavakkoli-Moghaddam and K. Pichka, Solving a new mathematical model for a hybrid flow shop scheduling problem with a processor assignment by a genetic algorithm. Int. J. Adv. Manuf. Technol. 61 (2012) 339–349. | DOI

G. I. Zobolas, C. D. Tarantilis and G. Ioannou, Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm. Comput. Oper. Res. 36 (2009) 1249–1267. | MR | Zbl | DOI

H. Zohali, B. Naderi, M. Mohammadi and V. Roshanaei, Reformulation, linearization, and a hybrid iterated local search algorithm for economic lot-sizing and sequencing in hybrid flow shop problems. Comput. Oper. Res. 104 (2019) 127–138. | MR | DOI

Cité par Sources :